GNWT-FIN - MV2014X0027
Status:
Expired
Authorization:
Land Use Permit
Activity:
Miscellaneous
Start:
December 15, 2014
Expiry:
December 15, 2021
Staff:
Tyree Mullaney
Mackenzie Valley Fibreoptics Project: Installation of a buried fibre optic cable system between the existingfibre-based infrastructure at the junction of Highway 1and Highway 7 (McGill Lake Microwave site near Checkpoint Junction) and the Town of lnuvik, NT. Please see Section 3 -Proposed Development in the attached Project Description Report (PDR) for a detailed description of the proposed development.
Accompanied by MV2014L1-0011.
Transboundary with Dehcho Region, and the Sahtu and Metis Settlement Area, and Gwichin Settlement Area.
Documents
- All Issuances (5)
- Annual Reports (1)
- Application and Related Docs (23)
- Assorted Management Plans (7)
- Consultations - Reviews - Work Plans (15)
- Designs and As-Builts (1)
- Engagement Plan (6)
- External Authorizations (1)
- Final Plan and Clearance (5)
- GIS Data (1)
- Inspection Reports (141)
- Interim Closure and Reclamation Plan (4)
- Operations and Notifications (39)
- Other (7)
- Preliminary Screening (2)
- Progressive Reclamation (1)
- Sediment and Erosion Control (7)
- Spill - Contingency - Emergency Response (7)
- Waste Management Plan (6)
Displaying 201 - 281 of 281
5. Reports and Studies
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
MV2014X0027 MV2014L1-0011 - GNWT Finance - MVFL - Waste Management Plan REV3 - Feb14-17.pdf (256.5 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2014X0027 - GNWT - Department of Finance - Approval - Engagement Plan - Apr6-17.pdf (728.45 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2014X0027 - GNWT-Finance - February3-2015 Inspection Report - GNWT Lands - Sahtu Region - Feb6-15.pdf (727.57 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2014X0027 MV2014L1-0011 - GNWT-Finance - Request for review on the WWH Protection Plan - Feb18-15.pdf (237.11 KB) | ||
MV2014X0027 MV2014L1-0011 - GNWT- Finance - MVFL Wildlife and Wildife Habitat Protection Plan - Feb13-15.pdf (1.23 MB) |
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
MV2014X0027 MV2014L1-0011 - GNWT Finance - Closure and Reclamation Plan - Staff Report and Comments - May10-17.pdf (1.03 MB) | ||
MV2014X0027 MV2014L1-0011 - GNWT Finance - Closure and Reclamation Plan V2 - Approval Letter - May10-17.pdf (201.33 KB) | ||
MV2014X0027 MV2014L1-0011 - GNWT Finance - Closure and Reclamation Plan Version 2 - May10-17.pdf (1.34 MB) | ||
MV2014X0027 MV2014L1-0011 - GNWT- Department of Finance - Closure and Reclamation Plan.pdf (516.33 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2014X0027 MV2014L1-0011 - GNWT Finance - Little Smith Winter Remediation Plan - Mar8-17.pdf (2.35 MB) |
9. GIS Data
Document | Received/Sent | Uploaded |
---|---|---|
MV2014X0027 MV2014L1-0011 - GNWT-Finance - MVFL_Route.zip (7.83 MB) |