Skip to main content

SNC-Lavalin Inc. Environment and Water - MV2014L8-0009

​To facilitate remedial excavation at the site, water from the excavation will be pumped into storage tanks, then through an on-site water treatment system and finally discharged back to the site (refer to Drawing 133685-LET6). The treated water will be tested prior to initial discharge and periodically during the water treatment works to ensure effectiveness of the water treatment system.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2014L8-0009 - SNC Lavalin - Notice of Draft Water Licence on ORS - Jul18-14.pdf (111.03 KB)
MV2014L8-0009 - Draft Water Licence for review -Jul18-14.pdf (98.57 KB)
MV2014L8-0009 - SNC Lavalin - Request for comments on WL Application - Jul16-14.pdf (1.12 MB)