GNWT-FIN - MV2014L1-0011
Status:
Expired
Authorization:
Licence
Activity:
Industrial
Start:
December 15, 2014
Expiry:
December 14, 2021
Staff:
Tyree Mullaney
Mackenzie Valley Fibreoptics Project: Installation of a buried fibre optic cable system between the existingfibre-based infrastructure at the junction of Highway 1and Highway 7 (McGill Lake Microwave site near Checkpoint Junction) and the Town of lnuvik, NT. Please see Section 3 -Proposed Development in the attached Project Description Report (PDR) for a detailed description of the proposed development.
Accompanied by MV2014X0027.
Transboundary with Dehcho Region, and the Sahtu and Metis Settlement Area, and Gwichin Settlement Area.
Displaying 1 - 61 of 61
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
MV2014L1-0011 - GNWT - FIN - 2020 Annual Water Licence Report - July 29_21.pdf (639.73 KB) | ||
MV2014L1-0011 - GNWT-Finance - 2017 Annual Report - Jun19-18.pdf (869.39 KB) | ||
MV2014L1-0011 - GNWT Finance - 2016 Annual Report - May26-17.pdf (839.42 KB) | ||
MV2014X0027 MV2014L1-0011 - GNWT Finance - Annual Water License Report 2015 - Nov24-15.pdf (925.74 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2014X0027 MV2014L1-0011 - GNWT-Finance - Deposit of waste drilling mud - Aug29-15.pdf (220.04 KB) | ||
MV2014X0027 MV2014L1-0011 - GNWT-Finance - Deposit of waste drill mud - Aug13-15.pdf (197.71 KB) | ||
MV2014X0027 MV2014L1-0011 - GNWT-Finance - Deposit of Drilling mud - Aug11-15.pdf (207.16 KB) | ||
MV2014X0027 MV2014L1-0011 - GNWT-Finance - Deposit of waste drilling mud - Aug10-15.pdf (1.06 MB) |