Skip to main content

NWT Rare Earths Ltd. - MV2014D0001

​Thor Lake, NT. Preliminary site preparation ​and construction including site clearing, construction of laydown areas, sediment control structures, establishment of a camp, preliminary diesel fuel storage tank, temporary explosives storage, development of the underground decline and associated temporary infrastructure.

Refer also to MV2014L2-0001 and MV2018C0011.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2014D0001 MV2011C0006 - Avalon Rare Metals - May 6 2014 Inspection Report - May7-14.pdf (2.18 MB)
Operations and Notifications
Document Received/Sent Uploaded
MV2018C0011 MV2014L2-0001 MV2014D0001 - NWT Rare Earth - Update - Sep1_20.pdf (204.13 KB)
MV2014L2-0001 MV2014D0001 MV2018C0011 - Avalon - Demonstration Project Work Plan - Dec19_19.pdf (3.29 MB)
MV2014D0001 - Avalon Rare Metals - Site Supervision letter - Apr29-14.pdf (81.6 KB)