Skip to main content

Paramount Resources Ltd. - MV2013A0012

Fort Liard West: ​This application is to replace all facilities and activities previously approved under LUP MV2006P0021. No new camps will be required. An existing camp site at K-29 will support ongoing operations.

Wells included in this application are K-29, O-80, M-25, F-25 and the exisiting well facility at F-25A.

Potential ongoing surface uses contemplated in the new LUP include well re-entries, completions, suspensions, abandonments, production, reclamation, and remediation associated with the existing well sites, access roads, pipeline right-of-ways, borrow pits and campsites.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 10 of 10
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2013A0012 - Paramount Resources Ltd. - July 29, 2020 Inspection Report - Aug 21_20.pdf.pdf (4.48 MB)
MV2013A0012 - Paramount Resources - Inspection Report (July 24) - August 31, 2018.pdf (739.78 KB)
MV2013A0012 - Paramount Resources - Inspection Report (July 25) - August 31, 2018.pdf (2.25 MB)
MV2013A0012 - Paramount Resources Ltd - Inspection Report for July 13 2016 - Wellsite K-29 - GNWT Lands - Sept13-16.pdf (1.43 MB)
MV2013A0012 - Paramount Resources Ltd - Inspection Report for July 13 2016 - Wellsite M-25 - GNWT Lands - Sept13-16.pdf (1.16 MB)
MV2013A0012 - Paramount Resources Ltd - Inspection Report for July 12 2016 - Wellsite O-80 - GNWT Lands - Sept13-16.pdf (708.48 KB)
MV2013A0012 - Paramount Resources Ltd - Inspection Report for July 13 2016 - Wellsite F-25 - GNWT Lands - Sept13-16.pdf (1.15 MB)
MV2013A0012 - Paramount Resources Ltd - Inspection Report for July 13 2016 - Wellsite F-25A - GNWT Lands - Sept13-16.pdf (1.18 MB)
MV2013A0012 - Paramount Resources - Response to July 29 2015 Inspection Report - Paramount - Nov27-15.pdf (109.96 KB)
MV2013A0012 - Paramount Resources - July 29-15 Inspection Report - GNWT Lands - Sept1-15.pdf (2.4 MB)