Skip to main content

Strategic Oil and Gas Ltd. - MV2013A0010

Cameron  Hills,  NWT  Project  encompasses  winter  access  roads  (with  some permanent bridges), well sites (producing, suspended and abandoned), gas and oil gathering systems, processing facility including runoff retention ponds and fuel and chemical storage areas, a permanent camp including a sewage lagoon, and various borrow pits and sumps (Figure 2 in Appendix 1). Connectd to a transborder pipeline into Alberta. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
8. Closure and Reclamation
Interim Closure and Reclamation Plan
Document Received/Sent Uploaded
MV2013A0010 - MV2010L1-0001 - Strategic Oil and Gas - CSWM Plan Extension request to submit - Staff Report - Apr23-15.pdf (793.49 KB)
MV2013A0010 - MV2010L1-0001 - Strategic Oil Gas Ltd - CSWMP Extension Request approval letter - Apr23-15.pdf (117.87 KB)