Skip to main content

DIAND-GIANT - MV2012S0019

Giant Mine Freeze Optimination Study.Work will consist of land based drilling up to 135 holes using mud rotary, diamond drilling, and down the hole drilling methodologies, boring up to 45 holes using an auger, excavating 100 soil test pits, and associated activities such as fuel storage at the Giant Mine Site. This work is divided into four programs; (i) Freeze Optimization study
(ii) Design Support Drilling and Soils Testing (iii) A1, B1 and C1 Pit Channel Stability (iv) Undergraound Stability

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2012S0019 - AANDC-CARD - Final Clearance Letter- May10-18.pdf (139.82 KB)
MV2012S0019 - AANDC - Authorization of chemicals approved - Dec5-12.pdf (528.85 KB)
MV2012S0019 - AANDC - CARD - LUP Issuance letter with conditions - Sept13-12.pdf (749.43 KB)