Enbridge Pipelines (NW) Inc. - MV2012L1-0006

This project is located approximately 10km NE of Wrigley, NT at Kp 305 on the Norman Wells to Zama pipeline, where the pipeline crosses Hodgson Creek, NT. Proposed remedial work includes; Maintenance of the existing 50m long berm,  consisting of increasing the thickness of the existing riprap erosion protection, construction of a series of five vanes that are located adjacent to and upstream of the existing berm. Construction equipment access to the site is only available during the winter months. Construction is proposed during the period from January to March 2013.