Enbridge Pipelines (NW) Inc. - MV2012L1-0006

This project is located approximately 10km NE of Wrigley, NT at Kp 305 on the Norman Wells to Zama pipeline, where the pipeline crosses Hodgson Creek, NT. Proposed remedial work includes; Maintenance of the existing 50m long berm,  consisting of increasing the thickness of the existing riprap erosion protection, construction of a series of five vanes that are located adjacent to and upstream of the existing berm. Construction equipment access to the site is only available during the winter months. Construction is proposed during the period from January to March 2013.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 14 of 14
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2012L1-0006 and MV2012X0024 - Enbridge - Staff Report for New WL and LUP Application - Dec12-12.pdf (2.02 MB)
MV2012X0024 and MV2012L1-0006 - Enbridge - Updates for Construction start date - Dec14-12.pdf (432.03 KB)
MV2012L1-0006 - Enbridge - Type B Water Licence application complete - Oct15-12.pdf (89.92 KB)
MV2012L1-0006 - Additional information from Enbridge - Oct15-12.pdf (436.21 KB)
MV2012L1-0006 - Enbridge - Type B Water Licence application incomplete - Oct3-12.pdf (141.49 KB)
MV2012L1-0006 - Enbridge - New WL Application - Spill Contingency Plan - Sept14-12.pdf (1.85 MB)
MV2012L1-0006 - Enbridge - New WL Application - Waste MGMT Plan - Sept14-12.pdf (537.91 KB)
MV2012L1-0006 - Enbridge - New WL Application and cover page - Sept14-12.pdf (341.66 KB)
MV2012L1-0006 - Enbridge - NEW WL Application - Aquatic Environmental Assessment - Sept14-12.pdf (6.92 MB)
MV2012L1-0006 - Enbridge - New WL Application - Environmental MGMT Plan - Sept14-12.pdf (2.52 MB)
MV2012L1-0006 - Enbridge - New WL Application - Erosion protection works plan - Sept14-12.pdf (6.03 MB)
MV2012L1-0006 - Enbridge - New WL Application - Public Consultation Record - Sept14-12.pdf (821.16 KB)
MV2012L1-0006 - Enbridge - LUP Application Map - Sept14-12.pdf (6.12 MB)
MV2012L1-0006 - Enbridge - Erosion Control Work Plan at Hodgson Creek Site - Aug15-12.pdf (4.09 MB)