Skip to main content

Northwest Territories Power Corporation - MV2011L4-0002

Taltson Power Plant Renewal Application to replace Water Licence N1L4-0154

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 11 of 11
7. Monitoring Programs
Other Monitoring Program
Document Received/Sent Uploaded
NTPC - Taltson - May 2023 Fish Salvage Cover Letter During Maintenance Shutdown - Aug 25 _23.pdf (112.47 KB)
NTPC - Taltson - May 2023 Fish Salvage Report During Maintenance Shutdown - Aug 25 _23.pdf (2.62 MB)
NTPC - Taltson - Fisheries Act Authorization- 2021 Avoidance and Mitigation Measures Report - Sep1_22.pdf (1.22 MB)
NTPC - Taltson - Fisheries Act Authorization- 2020 Avoidance and Mitigation Measures Report - Sep1_22.pdf (963.87 KB)
NTPC - HEC – ResSim Hydrological Modelling Report V2 - Staff Report and Comments - Jul2_21.pdf (594.18 KB)
NTPC - Resubmission Required - HEC – ResSim Hydrological Modelling Report V2 - Jul2_21.pdf (166.88 KB)
MV2011L4-0002 - NTPC - Taltson AEMP Monitoring Reports - Board Staff Conformity Review - Conformity Letter - June2_21.pdf (349.61 KB)
MV2011L4-0002 - NTPC - Taltson AEMP 2019 Reports- Traditional Knowledge Study - Deferral to 2023- Mar10-21.pdf (200.74 KB)
MV2011L4-0002 - NTPC - Taltston - AEMP and SEMP Monitoring for 2015 - Mar31-16.pdf (37.76 MB)
MV2011L4-0002 - NTPC - 2014 AEMP SEMP Report Acceptance Letter - Jul16-15.pdf (44.23 KB)
MV2011L4-0002 - NTPC - Staff Report - 2014 AEMP SEMP Report - Jul16-15.pdf (339.48 KB)