-Geophysical surveys, IP or MagNLF, approx 10-20 line-kilometres, flagged line grid as much as possible, some cutting of brush
-mapping, prospecting and rock sampling
-diamond drilling (NQ-size core) of 1,000-1,500 metres in approximately 15 drill holes during each season