Skip to main content

Avalon Advanced Materials Inc. - MV2011C0006

This operation will involve the drilling of up to 200 NQ core holes to average depths of 200 meters each within the existing mineral lease and claim boundaries.  The program will be carried out over the course of two years.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 16 of 16
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2011C0006 - Avalon - Follow up to Inspection Reort for July 27 2016 - Nov29-16.pdf (307.14 KB)
MV2011C0006 - Avalon Advanced Materials - Inspection Report for September 15 2016 - GNWT Lands - Oct13-16.pdf (2.55 MB)
MV2011C0006 - Avalon - Reponse to August 20 2014 Inspection Report - Aug22-14.pdf (128.92 KB)
MV2011C0006 - Avalon - August 20 2014 Inspection Report - GNWT Lands - Aug21-14.pdf (3.12 MB)
MV2014D0001 and MV2011C0006 - Avalon - May 6 2014 Inspection Report - May7-14.pdf (2.18 MB)
MV2011C0006 - Avalon Rare Metals - March 27 2014 Inspection Report - AANDC - Mar31-14.pdf (2.42 MB)
MV2011C0006 - Avalon Rare Metals - August 1 2013 Inspection Report - Aug6-13.pdf (2.78 MB)
MV2011C0006 - Avalon - February 27 2013 Inspection Report - Mar1-13.pdf (1.7 MB)
MV2011C0006 - Avalon - February 27 2012 Inspection Report - Mar1-13.pdf (2.57 MB)
MV2011C0006 - Avalon - Follow up on February 27 2013 Inspection Report - Feb27-13.pdf (284.22 KB)
MV2011C0006 - Avalon - Inspection report for August 22 2012 - Aug29-12.pdf (3.27 MB)
MV2011C0006 - Inspection Report - Apr17-12.pdf (2.23 MB)
MV2011C0006 - Inspection Report - Feb29-12.pdf (5.13 MB)
MV2011C0006- Photos to follow up on Oct6-11 Insepction- Oct18-11.pdf (959.12 KB)
MV2011C0006 - October 6 2011 Inspection- Oct11-11.pdf (2.91 MB)
MV2011C0006 - Inspection Report - Jul21-11.pdf (2.08 MB)