Skip to main content

Town of Hay River - MV2009L3-0005

Hay River Municipal water usage (renewal of N1L3-0053)  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 57 of 57
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
Town of HR - Town update on wildlife egress requirement - Apr30-21.pdf (119.68 KB)
MV2009L3-0005 - Town of HR - Notification of treated soil use at Solid Waste Disposal Facilities - Jun26-19.pdf (69.45 KB)
MV2009L3-0005 - Town of HR - Correspondence with Inspector re removal of treated soils from biotreated pad - Jun25-19.pdf (144.54 KB)
MV2009L3-0005 - Town of HR - Spring Inspection follow-up correspondence - Jun18-19.pdf (6.74 MB)
MV2009L3-0005 - Town of HR - Extension Request for ICRP and Landfill Drainage Study - Dec6-18.pdf (514.5 KB)
MV2009L3-0005 - Town of HR - Extension Request for ICRP and Landfill Drainage Study - Jul30-18.pdf (118.01 KB)
MV2009L3-0005 - Hay River - follow-up from June 13 2018 meeting - Jun20-18.pdf (63.83 KB)
MV2009L3-0005 – Hay River – June 2018 update on Sewage Disposal Facilities wetland berm maintenance – Jun14-18.pdf (298.81 KB)
MV2009L3-0005 - Town of Hay River - WL submission status table - Jun1-18.pdf (318.94 KB)
MV2009L3-0005 - Town of HR - Update from TOHR re upcoming submission deadlines - Mar13-18.pdf (118.21 KB)
MV20009L3-0005 - Town of HR - Extension Request for various submission - Dec28-17.pdf (247.3 KB)
MV2009L3-0005 - Town of HR - Extension request for various submissions - Dec28-17.pdf (269.39 KB)
MV2009L3-0005 - Town of Hay River - notification of submission of Snow Disposal Plan - Nov8-17.pdf (68.56 KB)
MV2009L3-0005 - Town of Hay River - notification of submission of high-res facility maps - Oct31-17.pdf (70.91 KB)
MV2009L3-0005 - Town of Hay River - Licence Requirements - Submission Extension - Staff Report and Comments - Apr6-17.pdf (1.06 MB)
MV2009L3-0005 - Town of Hay River - Approval - Licence Requirements - Submission Extension - Apr6-17.pdf (370.84 KB)
MV2009L3-0005 - Town of Hay River - WL Meeting Jan24 2017 - Summary Notes - Feb2-17.pdf (370.33 KB)
MV2009L3-0025 - Town of HR - Updated Town response to proposed SNP Changes - Mar13-17.pdf (139.05 KB)
MV2009L3-0005 - Town of HR - Submission date extension request for various plans and Licence Requirments - Feb15-17.pdf (137.93 KB)
MV2009L3-0005 - Town of HR - Operational issues with table prepared by Inspector for Jan 24 2017 meeting with Town - Feb3-17.pdf (238.41 KB)
MV2009L3-0005 - Town of HR - Operational Issues Update for Jan 24 2017 Meeting from ENR Inspector - Jan20-17.pdf (238.47 KB)
MV2009L3-0005 - Town of HR - Meeting Annoucement for January 24 2017 - Jan16-17.pdf (1.39 MB)
MV2009L3-0005 - Town of HR - Meeting Announcement for January 24 2017 - Dec16-16.pdf (227.56 KB)
MV2009L3-0005 - Town of HR - Town response to proposed SNP Changes - Dec15-16.pdf (145.77 KB)
MV2009L3-0005 - Town of HR - Email from Town re current status of Biotreatment Pad Operations - Nov28-16.pdf (714.73 KB)
MV2009L3-0005 - Town of HR - Arial photos of HR Water and Waste facilities - Nov28-16.pdf (20.2 MB)
MV2009L3-0005 - Town of HR - KBL Operations at HR Soil Treatment Facility - correspondence re investigation - Sept27-16.pdf (564 KB)
MV2009L3-0005 - Town of HR - Summary notes from Inspector SNP change request conference call - Sept 13 2016.pdf (78.61 KB)
MV2009L3-0005 - Town of HR - Call to discuss GNWT Inpsector request for SNP Changes - Sept9-16.pdf (305.12 KB)
MV2009L3-0005 - Town of HR - GNWT Inspector request for SNP changes - Jul23-16.pdf (571.01 KB)
MV2009L3-0005 - Town of HR - Correspondence on removal of water storage tanks from Biotreatment Pad site - Jul21-16.pdf (64.6 KB)
MV2009L3-0005 - Town of HR - Biotreatment Pad sampling protocol - Jul6-16.pdf (322.6 KB)
MV2009L3-0005 - Townof HR - Analysis Comparison- Biotreatment Pad Soil Sampling results - jul4-16.xlsx (49.4 KB)
MV2009L3-0005 - Town of HR - Biotreatment Pad Soil Sampling results - Jul4-16.pdf (4.66 MB)
MV2009L3-0005 - Town of HR - KBL to use Additional tanks to store Biotreatment Pad retention pond water - Jun15-16.pdf (178.46 KB)
MV2009L3-0005 - Town of HR - ENR response to discharge Biotreatment Pad retention pond leachate to sewage lagoon - Jun15-16.pdf (448.4 KB)
MV2009L3-0005 - Town of HR - Lab analytical results for Biotreatment Pad retention pond water and storage tanks - Jun14-16.pdf (4.54 MB)
MV2009L3-0005 - Town of HR - Correspondence from KBL on Biotreatment Pad retention pond discharge notification - Jun13-16.pdf (3.7 MB)
MV2009L3-0005 - Town of HR - Inspector response to Town Biotreatment Pad retention pond discharge notification - Jun8-16.pdf (192.54 KB)
MV2009L3-0005 - Town of HR - Notification of discharge from Biotreatment pad retention pond to sewage lagoon - Jun6-16.pdf (1.49 MB)
MV2009L3-0005 - Town of HR - Correspondence on sludge measurement and desludging sewage lagoons - May30-16.pdf (6.31 MB)
MV2009L3-0005 - Town of HR - Update on SNP groundwater sampling - May30-16.pdf (263.22 KB)
MV2009L3-0005 - Town of HR - Operational update - May12-16.pdf (188.55 KB)
MV2009L3-0005- Town of HR - Notes for Apr21-16 meeting on timelines for Water Licence submissions - May2-16.pdf (445.27 KB)
MV2009L3-0005 - Town of HR - Draft Licence compliance summary from the Inspector for Mar 15-16 meeting - Mar15-16.pdf (149.99 KB)
MV2009L3-0005 - Town of HR - Summary of WL submission status for Mar15-16 meeting - Mar14-16.pdf (83.98 KB)
MV2009L3-0005 - Town of HR - Draft agenda and call-in details for March 15 MTG to discuss the Town of Hay River WL - Mar4-16.pdf (241.09 KB)
MV2009L3-0005 - Town of HR - Meeting Announcement - Municipal WL - Feb25-16.pdf (124.4 KB)
MV2009L3-0005 - Town of HR - Town and KBL response to ENR Aug 28-15 Follow up Letter - Sept9-15.pdf (533.89 KB)
MV2009L3-0005 - Town of HR - KBL Response to ENR Aug 28 2015 Letter - Aug28-15.pdf (203.52 KB)
MV2009L3-0005 - Town of HR - ENR letter to HR on Biotreatment Pad inspection and follow up - Aug28-15.pdf (160.52 KB)
MV2009L3-0005 - Town of HR - Correspondence on Groundwater Monitoring Well Locations - GNWT Inspector - Jul8-15.pdf (183.39 KB)
MV2009L3-0005 - Town of HR - KBL Response to ENR on proposed treatment strategy for contaminated soil - May25-15.pdf (697.52 KB)
MV2009L3-0005 - Town of HR - KBL actions to repond to inspection findings - May28-15.pdf (1.23 MB)
MV2009L3-0005 - Town of HR - Correspondence between ENR and KBL on treatment of contaminated soil - May6-15.pdf (2.8 MB)
MV2009L3-0005 - Town of HR - ENR Questions to HR concerning treatment of contaminated soil - Oct24-14.pdf (182.35 KB)
MV2009L3-0005 - Town of HR - Conceptual Model for Solid Waste Disposal Facility- Nov4-11.pdf (5.44 MB)