Skip to main content

DIAND-GIANT - MV2007L8-0031

Giant Mine Remediation Project - an abandoned and orphaned former gold mine located in Yellowknife. Replaces expired water licence N1L2-0043 Referred to Environmental Assessment - EA0809-001 in 2008; Post-EA Information Package submitted April 1, 2019; Board recommended Minister approval of Type A Water Licence August 7, 2020; Issuance of Type A Water Licence September 18, 2020

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 100 of 140
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
GMRP - Draft Water Licence Conditions - Mar5-20.pdf (930.46 KB)
GMRP - Giant Borrow Engagement Session Report - Jan17-20.pdf (1.02 MB)
GMRP - Golder 2004 Report on Environmental Assessment - YK Bay Tailings - Reference - Jan16-20.pdf (20.12 MB)
GMRP - Update to Draft Licence Appendix B - Conformity Table of Items Requiring Submission - Jan10-20.pdf (70.13 KB)
GMRP - Closure and Reclamation Plan (C and R Plan) - Apr1-19.pdf (39.8 MB)
GMRP - Removal of Partial Minewater Raise RRP - Aug15-19.pdf (307.39 KB)
GMRP - Determination of the Requirement for a WMMP - Jul5-19.pdf (1.21 MB)
GMRP - Environmental Agreement and Co-operation Agreement - Jul4-19.pdf (9.98 MB)
GMRP - Licence Renewal applicaton - Oct14-07.pdf (4.6 MB)
GMRP - GNWT Description of Federal Reserve Lands for Giant Project - Apr16-19.pdf (413 KB)
GMRP - Post EA - C and R Plan App 5-6C - Geotech and Geochem Invest Factual Report Part 2 - Apr1-19.pdf (20.87 MB)
GMRP - Post EA - C and R Plan App 5-6C - Geotech and Geochem Invest Factual Report Part 1 - Apr1-19.pdf (7.31 MB)
GMRP - Post EA - C and R Plan App 5-9A - Prelim Design for Demo and Debris Removal Pt 2 - Apr1-19.pdf (19.76 MB)
GMRP - Post EA - C and R Plan App 5-9A - Prelim Design for Demo and Debris Removal Pt 1 - Apr1-19.pdf (7.84 MB)
GMRP - Post EA - C and R Plan App 5-8A - Prelim Design Report for Water Trtmt Plant - Apr1-19.pdf (20.45 MB)
GMRP - Post EA - C and R Plan App 5-10A - Non-Haz Waste Landfill Prelim Design Report - Apr1-19.pdf (3.7 MB)
GMRP - Post EA - C and R Plan App 5-9A - Prelim Design for Demo and Debris Removal Pt 4 - Apr1-19.pdf (13.94 MB)
GMRP - Post EA - C and R Plan App 5-9A - Prelim Design for Demo and Debris Removal Pt 3 - Apr1-19.pdf (8.11 MB)
GMRP - Post EA - C and R Plan App 2E - Human Health and Ecological Risk Assessment Part 4- Apr1-19.pdf (12.93 MB)
GMRP - Post EA - C and R Plan App 2E - Human Health and Ecological Risk Assessment Part 3 - Apr1-19.pdf (15.17 MB)
GMRP - Post EA - C and R Plan App 2E - Human Health and Ecological Risk Assessment Part 2 - Apr1-19.pdf (12.16 MB)
GMRP - Response to Pre-engagement Reviewer Comments - Apr1-19.pdf (431.01 KB)
GMRP - New Application - Preliminary Screening Document - Apr1-19.pdf (1.03 MB)
GMRP - Post EA - Tailings Management and Monitoring Plan - Apr1-19.pdf (8.93 MB)
GMRP - Post EA - WL Application - Post EA Information Package - Apr1-19.pdf (5.54 MB)
GMRP - Post EA - C and R Plan Appendix 5-5B - Reclamation Research - Treatment Systems - Apr1-19.pdf (11.15 MB)
GMRP - Post EA - C and R Plan Appendix 5-5A - Baker Creek Diversion Alternatives Evaluation - Apr1-19.pdf (5.83 MB)
GMRP - Post EA - C and R Plan Appendix 5-0A - Closure Objectives - Apr1-19.pdf (361.96 KB)
GMRP - Post EA - C and R Plan Appendix 4A - Lessons Learned - Aopr1-19.pdf (230.86 KB)
GMRP - Post EA - C and R Plan Appendix 5-3B - Open Pit Closure Options Assessment - Apr1-19.pdf (9.34 MB)
GMRP - Post EA - C and R Plan Appendix 5-2A - Freeze Program Design Basis Report - Apr1-19.pdf (2.45 MB)
GMRP - Post EA - Conceptual Aquatic Effects Monitoring Program Design Plan - YK Bay - Apr1-19.pdf (4.36 MB)
GMRP - Post EA - Spill Contingency Plan - Apr1-19.pdf (7.63 MB)
GMRP - Post EA - Wildlife and Wildlife Habitat Monitoring and Management Plan - Apr1-19.pdf (1.32 MB)
GMRP - Post EA - Waste Management and Monitoring Plan - Apr1-19.pdf (5.13 MB)
GMRP - Post EA - Standard Operating Procedures for Effluent and Water Sampling - Part 1 - Apr1-19.pdf (2.86 MB)
GMRP - Post EA - Erosion and Sediment Management and Monitoring Plan - Apr1-19.pdf (3.11 MB)
GMRP - Post EA - Dust Management and Monitoring Plan - Apr1-19.pdf (6.87 MB)
GMRP - Post EA - Proposed Surveillance Network Program - Apr1-19.pdf (580.03 KB)
GMRP - Post EA - C and R Plan Appendix 2C - Water Quality Tables - Apr1-19.pdf (389.48 KB)
GMRP - Post EA - Engagement Plan - Apr1-19.pdf (11.08 MB)
GMRP - Post EA - Effluent Quality Criteria Report Attachments - Apr1-19.pdf (1.93 MB)
GMRP - Post EA - Effluent Quality Criteria Report - Apr1-19.pdf (45.33 MB)
GMRP - Post EA - Closure and Reclamation Plan (C and R Plan) - Apr1-19.pdf (33.55 MB)
GMRP - Post EA - C and R Plan Appendix 2B - Baker Creek Ecosystem Synthesis Report - Apr1-19.pdf (14.77 MB)
GMRP - Post EA - C and R Plan Appendix 2D - Giant Mine 2017 MMER-EEM Annual Report - Apr1-19.pdf (9.12 MB)
GMRP - Post EA - Aquatic Effects Monitoring Program Design Plan - Baker Creek - Apr1-19.pdf (9.11 MB)
GMRP - Post EA - C and R Plan Appendix 5-6A - Conceptual Tailings Cover Design - Apr1-19.pdf (9.13 MB)
GMRP - Post EA - C and R Plan Appendix 5-6B - Tailings Remedial Options Report Part 2- Apr1-19.pdf (7.35 MB)
GMRP - Post EA - C and R Plan Appendix 5-1A - Arsenic Waste Disposal Scenarios Memo - Apr1-19.pdf (2.36 MB)
GMRP - Post EA - C and R Plan App 5-8B - New ETP Outfall Location Options Analysis - Apr1-19.pdf (6.68 MB)
GMRP - Post EA - C and R Plan App 5-6D - Cover Design Remedial Options and Trade-off Report - Apr1-19.pdf (1.81 MB)
GMRP - Post EA - C and R Plan App 1B - SDE Options Evaluation Workshop - Apr1-19.pdf (10.07 MB)
GMRP - Post EA - C and R Plan Appendix 2A - Site Photos - Apr1-19.pdf (4.6 MB)
GMRP - Post EA - Water Management and Monitoring Plan - Apr1-19.pdf (12.57 MB)
GMRP - Post EA - C and R Plan Appendix 5-3A - Description of Open Pits - Apr1-19.pdf (2.4 MB)
GMRP - Post EA - C and R Plan Appendix 1A - Concordance Table - Apr1-19.pdf (64.41 KB)
GMRP - Post EA - C and R Plan Appendix 5-5C - Baker Creek Flood Hazard Asmt Part 1 and 2 - Apr1-19.pdf (22 MB)
GMRP - Post EA - C and R Plan Appendix 5-6B - Tailings Remedial Options Report Part 1 - Apr1-19.pdf (5.93 MB)
GMRP - Post EA - C and R Plan Appendix 5-6B - Tailings Remedial Options Report Part 3- Apr1-19.pdf (20.94 MB)
GMRP - Post EA - C and R Plan Appendix 5-6B - Tailings Remedial Options Report Part 4 - Apr1-19.pdf (7.66 MB)
GMRP - Post EA - Standard Operating Procedures for Effluent and Water Sampling - Part 2 - Apr1-19.pdf (13.12 MB)
GMRP - Post EA - C and R Plan App 5-10B - Site Location for Non-hazardous Waste Landfill - Apr1-19.pdf (12.49 MB)
GMRP - Post EA - C and R Plan App 5-7A - Supplemental Borrow Source Identification Report - Apr1-19.pdf (801.59 KB)
GMRP - Post EA - C and R Plan App 2E - Human Health and Ecological Risk Assessment Part 1 - Apr1-19.pdf (9.84 MB)
GMRP - Post EA - C and R Plan App 5-1B - Minewater Level Raise Reclamation Research Plan - Apr1-19.pdf (150.7 KB)
GMRP - Post EA - C and R Plan App 5-4A - Strategy for Contaminated Soil and Sediment - Apr1-19.pdf (14.74 MB)
GMRP - Post EA - C and R Plan App 5-4B - Dam 3 Contamination Reclamation Research Plan - Apr1-19.pdf (685.83 KB)
GMRP - Reference Documents Apr1-2019.xlsx (143.15 KB)
GMRP - Giant Mine Remediation Plan Figures 1-1-1 to 3-8-1 - Jul-07.pdf (24.93 MB)
GMRP - Giant Mine Remediation Plan Figures 6-1-1 to 8-1-1- Jul-07.pdf (25.72 MB)
GMRP - Giant Mine Remediation Plan Figures 4-4-1 to 5-8-1- Jul-07.pdf (13.99 MB)
GMRP - GMOB Motion for Interim Type B Water Licence - Reasons for Decision - Sep20-18.pdf (306.92 KB)
GMRP - GMOB Motion for Interim Type B Water Licence - Staff Report and Comments - Sep20-18.pdf (585.12 KB)
GMRP - Letter from DIAND-GIANT Re Project Status Update - Aug4-17.pdf (295.92 KB)
GMRP - Response from DIAND-GIANT Re Post-EA Submission Requirements - Sep5-14.pdf (89.72 KB)
GMRP - Letter to DIAND-GIANT Re Post-EA Submission Requirements for WL and LUPA - Aug20-14.pdf (519.27 KB)
GMRP - Email Re Alternatives North concerns on Preliminary Screening Scope for Jo Jo Lake - Feb27-12.pdf (63.2 KB)
GMRP - City of Yellowknife Referral for Environmental Assessment - Mar31-08.pdf (1.83 MB)
GMRP - Letter to YKDFN Re Board Decision on Preliminary Screening - Mar19-08.pdf (311.93 KB)
GMRP - Staff Report -New Water Licence Application- Feb20-08.pdf (1.73 MB)
GMRP - Email Re Retaining Structures - Feb10-08.pdf (44.71 KB)
GMRP - Email Re Fuel Use and Storage - Feb7-08.pdf (166.35 KB)
GMRP - Email Re Power Supply - Feb4-08.pdf (44.77 KB)
GMRP - Application Deemed Complete - Oct18-07.pdf (170.81 KB)
GMRP - Application Received - Oct18-07.pdf (1.49 MB)
GMRP - Water Licence Application Cover Letter - Oct18-07.pdf (61.1 KB)
GMRP - Giant Mine Remediation Plan Figures - Jul30-07.pdf (11.04 MB)
GMRP - Supporting Document A10 - GIANT Mine Migratory Bird Survey - Dec16-04.pdf (28.03 MB)
GMRP - Supporting Document A11 - Baseline Air-Quality Monitoring at Giant Mine - Jun-05.pdf (922.7 KB)
GMRP - Supporting Document A01 - YKDFN TK Report - Oct13-05.pdf (5.71 MB)
GMRP - Supporting Document A03 - Ecological Investigation at Giant Mine - Dec12-03.pdf (28.75 MB)
GMRP - Supporting Document A04 - Biological Sampling at Baker Creek 2002 - Nov-02.pdf (24.4 MB)
GMRP - Supporting Document A06 - Baker Creek Fish Habitat and Rehabilitation Study - Oct21-98.pdf (6.8 MB)
GMRP - Supporting Document B03 - Giant Mine Tailings Backfill - Jul10-02.pdf (571.33 KB)
GMRP - Supporting Document B04 - Underground Mine Water Chemistry - May-05.pdf (2.44 MB)
GMRP - Supporting Document B07 - Geochemical Characterization Of Other Sources - May-05.pdf (3.96 MB)
GMRP - Supporting Document C02 - Water Balance Update - Dec2-04.pdf (49.65 KB)
GMRP - Supporting Document C03_- Groundwater Monitoring System Installation - Jan-05.pdf (18.75 MB)
GMRP - Supporting Document E01 - Crown Pillar Stability Investigation - Jan17-06.pdf (2.27 MB)