Skip to main content

Pine Point Holding Corporation - MV2006L2-0003

Pine Point Pilot Project (PPPP) - Proposed Pb/Zn pilot plant to confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months.
Refer also to Permit MV2011C0015.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 41 of 41
2. Initial/Renewal Application
Technical Session
Document Received/Sent Uploaded
MV2006L2-0003- Technical session cancelled- Sept26-11.pdf (236.9 KB)
MV06L2-03 Information Requests and Responses Under Review Sep02-08.pdf (1.17 MB)
MV06L2-03 TAM Information Request Response 2 Aug26-08.pdf (725.25 KB)
MV06L2-03 TAM Response to DKFN Intervention Aug26-08.pdf (74.09 KB)
MV06L2-03 TAM Response to INAC Aug25 Intervention Aug26-08.pdf (1.24 MB)
MV06L2-03 DKFN Intervention Aug25-08.pdf (338.66 KB)
MV06L2-03 EC Intervention Aug25-08.pdf (388.12 KB)
MV06L2-03 Public Hearing Start Time Changed Aug20-08.pdf (269.96 KB)
MV06L2-03 TAM Response to Remaining Undertakings Aug18-08.pdf (205.03 KB)
MV06L2-03 Pre-Hearing Conference Rescheduled Aug18-08.pdf (266.65 KB)
MV06L2-03 PPPP Technical Session List of Undertakings Aug18-08.pdf (391.43 KB)
MV06L2-03 Pre-Hearing Conference Postponed Aug15-08.pdf (255.54 KB)
Hydro Test of R190 Brown Erdman Assoc LTD.pdf (3.57 MB)
R190 Mass and Volume Balance.xlsx (43.38 KB)
Freeze Production Power.xlsx (46.48 KB)
DMS test results 3-3-06.xls (171 KB)
SGS ABA Results 2008-Feb27.xls (100.5 KB)
Technical response letter 5Oct2007.pdf (145.13 KB)
Table 3.3-1 revised.pdf (29.53 KB)
Stevenson International Groundwater Consultants LTd.1984.pdf (19.58 MB)
Stevenson Int. Hydro of R 190 Nov 1983.pdf (8.66 MB)
Jan 2008 Pine Point Ground Freezing- Engineering Report.pdf (2.03 MB)
INAC-WRD Security Estimate.pdf (7.54 MB)
EBA_Ammonia Release Undertaking_07July27.pdf (65.51 KB)
EBA groundwater velocity report 9-18-06.pdf (299.2 KB)
Biodisk monitoring.pdf (50.97 KB)
EBA (7-30-07) Deep Disposal (Injection Well) Letter.pdf (78.52 KB)
BioDisk Effluent Quality rpts.pdf (365.58 KB)
Basal Inflow Evaluation PPPP NWT.pdf (1.37 MB)
Attachment 2 water leach test SGS.pdf (71.24 KB)
Attachment 1 combined flotation discharge SGS.pdf (67.64 KB)
INAC-WRD Security Estimate.ppt (182.5 KB)
7-18-08 Water Balance per hour IW.pdf (145.52 KB)
Tamerlane-Technical Session - Day2-Aug14.pdf (131.78 KB)
MV06L2-03 TAM Technical Session Minutes Day 2 Aug14-08.PDF (250.92 KB)
Presentation - Tamerlane- Aug 13 2008.pdf (6.25 MB)
Tamerlane Technical Sessions - Day1- Aug13.pdf (239.98 KB)
MV06L2-03 TAM Technical Session Minutes Day 1 Aug13-08.PDF (466.2 KB)
MV06L2-03 Technical Session Announcement July29-08.pdf (499.57 KB)
MV06L2-03 Rescheduling of Technical Session PPPP July15-08.pdf (326.7 KB)
3. Amendment Application
Technical Session
Document Received/Sent Uploaded
MV2006L2-0003 - MV2011C0015 - Proposed Change to Technical Session Date - Aug18-11.pdf (1.08 MB)