Skip to main content

Northwest Territories Power Corporation - MV2005L4-0008

Bluefish Power Generation Facility, located at the north end of Propserous Lake.
Renewal of Licence N1L4-0735

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 7 of 7
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2005L4-0008 - NTPC - Dam Safety Inspection Report for 2015 - Dec14-15.pdf (3.67 MB)
MV2005L4-0008 - NTPC - Bluefish - July 16-15 Inspection Report - GNWT ENR - Sept3-15.pdf (1.12 MB)
MV2005L4-0008 - NTPC - Bluefish - July 16-15 Inspectiom Report - GNWT ENR - Sept3-15.pdf (1.12 MB)
MV2005L4-0008 - Inspection Report - Jun17-10.pdf (1.71 MB)
MV2005L4-0008 - Inspection Report - Oct 5-09.pdf (12.86 MB)
MV05L4-08 Water License Inspection Report July31-08.pdf (1.21 MB)
MV05L4-08-InspRpt-Jan25-08.pdf (406.88 KB)