Skip to main content

Paramount Resources Ltd. - MV2002L1-0010

to drill a new well at O-21 and potentially install wellsite equipment and a pipeline linking the well to the existing Shiha Liard Pipeline  
Uploaded On or After
Uploaded On or Before
Displaying 1 - 13 of 13
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
MV2002L1-0010 - Annual Report Requiremnts - Aug 12-09.pdf (77.79 KB)
MV2002L1-0010 - Annual Report Letter - Jul24-08.pdf (145.02 KB)
MV2002L1-0010 - Annual Water Report - 2008 - Jun11-08.pdf (1.72 MB)
MV02L1-10 - Annual Report Received - Nov13-07.pdf (121.79 KB)
MV02L1-10 - Annual Report Revised - Nov06-07.pdf (95.05 KB)
MV02L1-10 - Annual Report - Sep05-07.pdf (53.12 KB)
MV02L1-10 - Annual Report - 2005 - May17-06.pdf (47.09 KB)
MV20002L1-0010 - Annual Report - Letter - Apr11-05.pdf (85.33 KB)
MV2002L1-0010 - Annual Report - Extension Request - Apr04-05.pdf (169.76 KB)
MV2002L11-0010 - Annual Report - Extension - May21-04.pdf (158.96 KB)
Designs and As-Builts
Document Received/Sent Uploaded
MV2002L1-0010 - As-Builts - Fort Liard - Sep13-07.pdf (53.63 KB)
Other
Document Received/Sent Uploaded
MV2002L1-0010 - Phase 2 ESA - N1 Revisit - Oct27-05.pdf (106.89 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2002L1-0010 - Emergency Response Plan Amendments - May12-08.pdf (2.13 MB)