Public Registry - Advanced Search
Primary tabs
Displaying 1 - 9 of 9
Note: Faded items are closed or expired, but the information is still available by clicking on the File Number.
Note: Faded items are closed or expired, but the information is still available by clicking on the File Number.
5. Reports and Studies
Company | Authorization Number | Document | Received | Uploaded |
---|---|---|---|---|
GNWT-INF (Sahtu) | S15L8-004 | S15L8-004 - GNWT-INF CCASAR Licence Closure Letter - Dec 23_20.pdf (355.08 KB) | ||
GNWT-INF (Sahtu) | S15L8-004 | S15L8-004 - Review Comment Table and ENR Letter - 2018-2019 Annual Report - Oct 29_19.pdf (235.86 KB) | ||
Transport Canada | S17X-004 | S17X-004 - Permittee Response to Inspection Report - Aug 20_19.pdf (1.61 MB) | ||
GNWT-INF (Sahtu) | S19L8-002 | S19L8-002 - Correspondence - Anticipated Amendment - In-water Geotechnical Drilling in Winter - Jul 29_19.pdf (119.34 KB) | ||
GNWT-INF (Sahtu) | S19L8-002 | S19L8-002 - Reference - Stantec 2018 - Fish Habitat Assessment Report - Great Bear River Bridge - May 31_ 19.pdf (2.03 MB) | ||
Imperial Oil Resources Ltd. | S18X-001 | S18X-001 - IORL Geotechnical Drilling Program LUP Application Staff Report 1 - Feb 15_18.pdf (539.15 KB) | ||
CIRNAC-CARD | S17L8-002 | S17L8-002 - GBL WL Renewal - Appendix K - List of Reports and Studies - May 26_17.PDF (90.88 KB) |
6. Management Plans
Company | Authorization Number | Document | Received | Uploaded |
---|---|---|---|---|
Transport Canada | S17L8-003 | S17L8-003 S17X-004 - Operation and Maintenance Plan - Version 1.0 - Feb 5_18.pdf (1.09 MB) |
7. Monitoring Programs
Company | Authorization Number | Document | Received | Uploaded |
---|---|---|---|---|
CIRNAC-CARD | S17L8-002 | S17L8-002 - Extension Request for Geochemical Verification Program - Sept 1_17.pdf (196.65 KB) |