CIRNAC-CARD - W2020L8-0003
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
November 18, 2021
Expiry:
November 17, 2031
Staff:
Anneli Jokela
This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:
a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; andh) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.
Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).
Documents
- AEMP - Annual Report (4)
- AEMP - Program (7)
- All Issuances (9)
- Annual Reports (2)
- Application and Related Docs (15)
- Assorted Management Plans (13)
- Consultations - Reviews - Work Plans (16)
- Designs and As-Builts (100)
- Engagement Plan (2)
- GIS Data (1)
- Interim Closure and Reclamation Plan (5)
- Operations and Notifications (4)
- Other (2)
- Preliminary Screening (4)
- Public Hearing (26)
- Sediment and Erosion Control (5)
- SNP Program (2)
- SNP Reports (17)
- Spill - Contingency - Emergency Response (8)
- Spill Reports (1)
- Technical Session (14)
- Waste Management Plan (5)
- Water Management (23)
Displaying 201 - 285 of 285
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - GT21-604 - Spill Follow up Report for NTNU 2023-500 - Dec 12_23.pdf (4.18 MB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Engagement Plan - Version 4.0 - Decision Letter - Sept 29_22.pdf (187.92 KB) | ||
Rayrock - Engagement Plan - Version 4.0 - Sept 19_22.pdf (1.62 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Reasons for Decision - Dec 14_23.pdf (322.24 KB) | ||
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Part 1 of 2 - Oct 18_23.pdf (18.29 MB) | ||
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Part 2 of 2 - Oct 18_23.pdf (5.66 MB) | ||
Rayrock - Sediment and Erosion Control Plan - Version 2.0 - Reasons for Decision - May 23_23.pdf (477.94 KB) | ||
Rayrock - Sediment and Erosion Control Plan - Version 2.0 - Mar 30_23.pdf (12.77 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Spill Contingency Plan - Version 4.2 - Part 1 - March 26_24.pdf (15.7 MB) | ||
Rayrock - Spill Contingency Plan - Version 4.2 - Part 2 - March 26_24.pdf (13.82 MB) | ||
Rayrock - Spill Contingency Plan - Version 4.2 – Conformity Confirmation – April 9_24.pdf (146.24 KB) | ||
Rayrock - Spill Contingency Plan - Version 4.1 - Decision Letter - Jul 6_23.pdf (210.31 KB) | ||
Rayrock - Spill Contingency Plan - Version 4.1 - Jun 7_23.pdf (21.4 MB) | ||
Rayrock - Spill Contingency Plan - Version 4.1 - Letter from Tlicho Government - Jun 2_23.pdf (751.73 KB) | ||
Rayrock - Spill Contingency Plan - Version 4.0 - Reasons for Decision - May 1_23.pdf (455.14 KB) | ||
Rayrock - Spill Contingency Plan - Version 4.0 - Mar 17_23.pdf (18.15 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Waste Management Plan - Version 4.1 - Reasons for Decision - April 02_24.pdf (381.09 KB) | ||
Rayrock - Waste Management Plan - Version 4.1 - Part 1 - Dec 21_23.pdf (7.71 MB) | ||
Rayrock - Waste Management Plan - Version 4.1 - Part 2 - Dec 21_23.pdf (20.84 MB) | ||
Rayrock - Waste Management Plan - Version 4.0 - Reasons for Decision - May 23_23.pdf (457.93 KB) | ||
Rayrock - Waste Management Plan - Version 4.0 - Apr 13_23.pdf (11.54 MB) |
7. Monitoring Programs
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - 2022 AEMP Annual Report - May 31_23.pdf (815.54 KB) | ||
Rayrock - 2022 AEMP Annual Report - Baseline Report - May 31_23.pdf (11.8 MB) | ||
Rayrock - 2022 AEMP Annual Report - Baseline Report Appendices - May 31_23.pdf (29.23 MB) | ||
Rayrock - 2022 AEMP Annual Report - Raw Data - May 31_23.zip (108.43 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - AEMP - Design Plan - Version 1.1 - Mar 1_24.pdf (21.52 MB) | ||
Rayrock - AEMP - Design Plan - Version 1.1 - Extension Request - Decision Letter - Jan 30_23.pdf (207.99 KB) | ||
Rayrock - AEMP - Design Plan - Version 1.1 - Extension Request - Jan 26_23.pdf (368.26 KB) | ||
Rayrock - AEMP - Design Plan - Version 1.0 - Decision Letter and Reasons for Decision - Jul 5_22.pdf (764.79 KB) | ||
Rayrock - AEMP - Design Plan - V 1.0 - Feb 16_22.pdf (6.56 MB) | ||
Rayrock - AEMP - Design Plan - V 1.0 - Dec 18_20.pdf (17.01 MB) | ||
Rayrock - AEMP - Design Plan - V 1.0 - Appendix A - Dec 18_20.pdf (12 MB) |
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Remedial Action Plan - Version 2.0 - Reasons For Decision - Mar 3_23.pdf (583.98 KB) | ||
Rayrock - Proposed Closure Objectives and Criteria - Mar 1_2022.pdf (655.72 KB) | ||
Rayrock - Closure Objectives and Criteria Workshop Agenda - Mar 1_22.pdf (180.28 KB) | ||
Rayrock - Closure Objectives and Criteria Workshop PPT - Mar 14_22.pdf (5.01 MB) | ||
Rayrock - Remedial Action Plan - Version 2.0 - Aug 18_22.pdf (1.02 MB) |
9. GIS Data
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - GIS Data - Oct 5_21.zip (13.95 KB) |