GNWT-INF (Sahtu) - S21Q-004

The GNWT-INF is planning to develop a new quarry (Dhu-1). The Project includes the following physical works and activities:

• Construction of an approximately 4 kilometre (km) winter access road from km 966.6 of the Mackenzie Valley Winter Road (MVWR) to Dhu-1 quarry

• Development and operation of the Dhu-1 quarry to produce up to 600,000 m3 of crushed rock (“material”)

• Stockpiling of material

• Construction and operation of temporary facilities to service the Project such as laydown areas, construction camp, explosive storage/mixing facility, fuel storage, equipment maintenance and storage areas, water supply, power generation and waste management

• Stabilization of quarry faces and stockpiles and removal of camp and equipment

The quarry is not proposed to be closed and reclaimed after the Project, as the quarry is intended to remain available for future use.

Documents

Displaying 1 - 17 of 17
Uploaded On or After
Uploaded On or Before
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S21Q-004 - GNWT-INF - Dhu1 Quarry - Land Use Permit Conditions and Permit Cover - Nov 10_21.pdf (465.46 KB) November 22, 2021 November 22, 2021
S21Q-004 - GNWT-INF Dhu-1 Quarry Permit - Decision Letter - Nov 22_21.pdf (261.81 KB) November 22, 2021 November 22, 2021
S21Q-004 - GNWT-INF - Dhu-1 Quarry - Reasons for Decision - Nov 10_21.pdf (255.06 KB) November 22, 2021 November 22, 2021
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S21Q-004- Staff Report 1- GNWT-INF Dhu-1 Quarry Permit Nov 10_21.pdf (399.47 KB) November 10, 2021 November 12, 2021
S21Q-004 - GNWT-INF - Dhu1 Quarry - Draft Land Use Permit Conditions - Oct 1_21.pdf (415.73 KB) October 1, 2021 October 1, 2021
Preliminary Screening
Document Received/Sent Uploaded
S21Q-004 - GNWT-INF - Dhu-1 Quarry - Preliminary Screening Determination and RFD - Nov 10_21.pdf (339.86 KB) November 10, 2021 November 10, 2021
S21Q-004 - Preliminary Screening Notification - Nov 10_21.pdf (226.78 KB) November 10, 2021 November 10, 2021
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
S21Q-004 - GNWT-INF - Dhu1 Quarry - Engagement Plan and Record - Sep 24_21.pdf (4.37 MB) September 24, 2021 November 18, 2021