​Remediation
and building decommissioning work at the former weather station
at Fort Reliance, NT. It is anticipated that the successful contractor will mobilize
equipment to the Site by barge as early as open water conditions will allow during the spring of 2019. A beach area
along the north shore of the Site is expected to provide the most favourable barge loading and unloading conditions. Equipment likely to be brought to the Site will potentially include loaders, man-lifts, rock trucks, compactors, pickup
trucks and/or smaller utility vehicles, excavators, portable camp buildings, generators, and various smaller powered
and hand-operated tools. Contractor and Departmental Representative staff are expected to mobilize to and from
the Site via regular float plane flights from Yellowknife and/or LutselK’e. On occasion, travel via helicopter could
also occur. It is expected that the contractor’s staff will be accommodated in the portable camp buildings on-site, and that
personnel representing the Crown (Crown employees and Departmental Representative staff) will be
accommodated at the adjacent Trophy Lodge. Specific remediation activities include: hazardous materials abatement, building demolition, landfill excavation, contaminated soil removal, surface debris collection and removal, and associated monitoring.

Documents

Displaying 1 - 47 of 47
E.g., 10/22/2019
E.g., 10/22/2019

1. Permit - Licence - Other Issuances

2. Initial/Renewal Application

Application and Related Docs
Document Received/Sent Uploaded
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation - Letter - Equipment Update (002) - Jul02_19.pdf (48.92 KB) July 3, 2019 July 4, 2019
MV2019X0004 - ECCC - Type A Land Use Permit - Staff Report and Comments - May1-19.pdf (664.29 KB) May 1, 2019 May 7, 2019
MV2019X0004 - ECCC - Fort Reliance Remediation Application - Figure 3-Borrow Site Plan - Apr23-19.pdf (224.61 KB) April 23, 2019 April 23, 2019
MV2019X0004 - ECCC - Email RE_ Updated LUP Application for Site Remediation - Fort Reliance Weather Station - Mar22-19.pdf (76.77 KB) March 22, 2019 March 29, 2019
MV2019X0004 - ECCC - DRAFT Land Use Permit Conditions - Mar29-19.pdf (244.29 KB) March 29, 2019 March 29, 2019
MV2019X0004 - ECCC - Updated Fort Reliance LUP Application - Mar28-19.pdf (6.96 MB) March 28, 2019 March 28, 2019
MV2019X0004 - ECCC - Fort Reliance Final Remedial Action Plan Report - Mar25-19.pdf (6.01 MB) March 25, 2019 March 25, 2019
MV2019X0004 - ECCC - Fort Reliance Quantitative Risk Assessment and Site-Specific Risk Assessment - Final - Mar25-19.pdf (1.5 MB) March 25, 2019 March 25, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation Updated Application - Mar21-19.pdf (6.25 MB) March 21, 2019 March 21, 2019
MV2019X0004 - ECCC - Fort Reliance Remediation - Type A - Application Incomplete - Jan28-19.pdf (152.88 KB) January 28, 2019 January 29, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation Application -Jan28-19.pdf (7.28 MB) January 25, 2019 January 28, 2019
Preliminary Screening
Document Received/Sent Uploaded
MV2019X0004 - ECCC - Preliminary Screening. Report - New LUP - May1-19pdf.pdf (318.89 KB) May 1, 2019 May 7, 2019

5. Reports and Studies

Operations and Notifications
Document Received/Sent Uploaded
MV2019X0004 - ECCC - Notice of Completion of Land Use Operation - Sept25-19.pdf (91.23 KB) September 25, 2019 September 26, 2019
MV2019X0004 - Environment Canada - Project update - Jul21-19.pdf (195.1 KB) July 21, 2019 August 14, 2019
MV2019X0004 - Environment Canada - Update on Operations Status at Fort Reliance - Jul29-19.pdf (90.2 KB) July 29, 2019 August 9, 2019
MV2014X0004 - ECCC - Fort Reliance Remediation Project - Radiation Survey Memo - Tetra Tech - May30-19.pdf (1021.44 KB) May 30, 2019 May 31, 2019

6. Management Plans

Assorted Management Plans
Document Received/Sent Uploaded
MV2019X0004 - ECCC - Various Management Plans - Staff Report and Comments - Jul18-19.pdf (19.19 MB) July 18, 2019 July 23, 2019
MV2019X0004 - ECCC - Interim Approval - Varisous Management Plans - Jul18-19.pdf (125.61 KB) July 18, 2019 July 23, 2019
MV2019X0004 - ECCC - Request for comments on the WMP-SPC and Engagement Plan - Jun3-19.pdf (344.49 KB) June 3, 2019 July 12, 2019
Engagement Plan
Document Received/Sent Uploaded
MV2019X0004 - ECCC - Fort Reliance Remediation - EP - Email of Jul05_19.pdf (268.44 KB) July 5, 2019 July 10, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation - Engagement Plan_v3.pdf (15.92 MB) June 28, 2019 July 10, 2019
MV2014X0004 - ECCC - Fort Reliance Remediation Project - Revised Engagement Plan - May28-19.pdf (8.57 MB) May 28, 2019 May 31, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation Engagement Plan - Mar21-19.pdf (8.1 MB) March 21, 2019 March 21, 2019
Sediment and Erosion Control
Document Received/Sent Uploaded
MV2019X0004 - ECCC - Sediment and Erosion Control Plan - Board Decision - Aug 9_19.pdf (130.39 KB) August 9, 2019 August 9, 2019
MV2019X0004 - ECCC - Request for comments on Sediment and Erosion Control plan - Jul10-19.pdf (386.26 KB) July 10, 2019 July 12, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation - Sediment and Erosion Control Plan Rev1 - Jun28_19.pdf (550.69 KB) July 28, 2019 July 4, 2019
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2019X0004 - ECCC - Fort Reliance Remediation - SCP - Email of Jul05_19.pdf (268.44 KB) July 5, 2019 July 10, 2019
MV2014X0004 - ECCC - Fort Reliance Remediation Project - Revised Spill Contingecy Plan - May28-19.pdf (7.43 MB) May 28, 2019 May 31, 2019
MV2019X0004 - ECCC - Updated Spill Contingency Plan - Mar26-19.pdf (7.22 MB) March 28, 2019 March 28, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation - Update Spill Contingency Plan - Mar21-19.pdf (6.74 MB) March 21, 2019 March 21, 2019
MV2019X0004 - ECCC - Fort Reliance Remediation - Spill Contingency Plan - Jan28-19.pdf (7.36 MB) January 25, 2019 January 28, 2019
Waste Management Plan
Document Received/Sent Uploaded
MV2019X0004 - ECCC - Fort Reliance Remediation - WMP - Email of Jul05_19.pdf (268.44 KB) July 5, 2019 July 10, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation - Waste Management Plan_v3.pdf (1.94 MB) June 28, 2019 July 10, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation - Spill Contingency Plan_v3.pdf (6.12 MB) June 28, 2019 July 10, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation - Technical Memo Radiation Survey and Sampling - May30_19.pdf (635.11 KB) May 30, 2019 July 10, 2019
MV2019X0004 - ECCC - Revised Waste Management Plan, Spill Contingency Plan, and Engagement Plan Conformity Tables - Jun3-19.pdf (47.45 KB) June 3, 2019 June 3, 2019
MV2014X0004 - ECCC - Fort Reliance Remediation Project - Revised Waste Management Plan - May28-19.pdf (6.07 MB) May 28, 2019 May 31, 2019
MV2019X0004 - ECCC - Updated Waste Management Plan Mar-26-19.pdf (5.88 MB) March 28, 2019 March 28, 2019
MV2019X0004 - ECCC - Fort Reliance Weather Station Remediation - Update Waste Management Plan - Mar21-19.pdf (2.22 MB) March 21, 2019 March 21, 2019
MV2019X0004 - ECCC - Fort Reliance Remediation Waste Management Plan - Jan28-19.pdf (5.91 MB) January 25, 2019 January 28, 2019

9. GIS Data

Shapefiles
Document Received/Sent Uploaded
MV2019X0004 - ECCC- GIS Data - Apr23-19.zip (3.18 KB) April 23, 2019 April 29, 2019