The Yellowknife soil treatment facility (STF) is located in the RTL Quarry, adjacent to the City of Yellowknife Landfill within the City of Yellowknife. The Facility is accessible by road, of Highway 4. Access is restricted and the main access point to the site is gated.
The STF is designed to receive, store, and treat petroleum hydrocarbon contaminated soil, water and snow generated primarily from residential, commercial and industrial properties where a hydrocarbon release has occurred. The STF will include operation and maintenance of a biotreatment pad and a water retention pond which operates primarily during the summer months. Following bioremediation, treated soil meeting licencecriteria will be transferred for use as daily cover at the Yellowknife Landfill. Soil determined through laboratory analysis to be unsuitable for re-use will be transported off site to an appropriate facility approved to accept the material for treatment or disposal.


Documents

Displaying 1 - 23 of 23
E.g., 08/25/2019
E.g., 08/25/2019

1. Permit - Licence - Other Issuances

All Issuances
Document Received/Sent Uploaded
MV2019L1-0003 - KBL Environmental Ltd - Administrative Update - Jun20-19.pdf (472.13 KB) June 20, 2019 June 20, 2019
MV2019L1-0003 - KBL Environmental Ltd - Administrative Update - Staff Report - Jun20-19.pdf (188.41 KB) June 20, 2019 June 20, 2019
MV2019L1-0003 - KBL Environmental Ltd - Issuance - Type B Water Licence - May16-19.pdf (955.37 KB) May 16, 2019 May 24, 2019
Security and Water Use Fees
Document Received/Sent Uploaded
MV2019L1-0003 - KBL Environmental Ltd - Receipt for WL Application Fee - C153088 - Apr9-19.pdf (108.37 KB) April 9, 2019 April 16, 2019

2. Initial/Renewal Application

Application and Related Docs
Document Received/Sent Uploaded
MV2019L1-0003 - KBL - emails re Surveillance Network Program and Effluent Quality Criteria - June 5-19.pdf (119.71 KB) June 5, 2019 June 20, 2019
MV2019L1-0003 - KBL Environmental Ltd - Issuance - Staff Report and Comments - May16-19.pdf (828.19 KB) May 16, 2019 May 24, 2019
MV2019L1-0003 - KBL Environmental Ltd. - Application Maps and Design Drawings - Mar21-19.pdf (8.47 MB) April 2, 2019 April 29, 2019
MV2019L1-0003 - KBL Environmental Ltd - Draft Licence Conditions - Apr2-19.pdf (552.7 KB) April 2, 2019 April 2, 2019
MV2019L1-0003 - KBL Environmental Ltd. - Type B Licence Application - Mar21-19.pdf (9.02 MB) March 21, 2019 March 25, 2019
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2019L1-0003 - KBL Environmental Ltd - UPDATE - Type B Water Licence Application Reveiw - Apr2-19.pdf (51.84 KB) April 2, 2019 April 4, 2019
Preliminary Screening
Document Received/Sent Uploaded
MV2014L1-0005 - KBL Environmental Ltd - Amendment - Type B Water Licence - Preliminary Screening - Sept8-16.pdf (163.14 KB) September 7, 2016 September 7, 2016

6. Management Plans

Assorted Management Plans
Document Received/Sent Uploaded
MV2019L1-0003 - KBL - YK Soil Treatment Facility -Groundwater Monitoring Plan - confirmation of conformity.pdf (179.11 KB) June 17, 2019 August 20, 2019
MV2019L1-0003 - KBL - YK Soil Treatment Facility - Groundwater Monitoring Plan_V.3.pdf (5.39 MB) June 17, 2019 August 20, 2019
MV2019L1-0003 - KBL Environmental Ltd. - Operation and Maintenance Plan - Mar21-19.pdf (10.18 MB) March 21, 2019 March 25, 2019
Engagement Plan
Document Received/Sent Uploaded
MV2019L1-0003 - KBL Environmental Ltd. - Engagement Plan and Summary - Mar21-19.pdf (262.99 KB) March 21, 2019 March 25, 2019
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2019L1-0003 - KBL Environmental Ltd. - Spill Contingency Plan - Mar21-19.pdf (3.45 MB) March 21, 2019 March 28, 2019
Waste Management Plan
Document Received/Sent Uploaded
MV2019L1-0003 - KBL - YK Soil Treatment Facility - Waste Management Plan V.5.pdf (4.7 MB) June 17, 2019 August 20, 2019
MV2019L1-0003 - KBL - YK Soil Treatment Facility - Waste Management Plans - confirmation of conformity.pdf (179.11 KB) August 20, 2019 August 20, 2019
MV2019L1-0003 - KBL Environmental Ltd. - Waste Management Plan - Mar21-19.pdf (4.88 MB) March 21, 2019 March 25, 2019

7. Monitoring Programs

Other Monitoring Program
Document Received/Sent Uploaded
MV2019L1-0003 - KBL Environmental Ltd. - Groundwater Monitoring Plan - Mar21-19.pdf (5.54 MB) March 21, 2019 March 25, 2019

8. Closure and Reclamation

Conceptual Closure and Reclamation Plan
Document Received/Sent Uploaded
MV2019L1-0003 - KBL - YK Soil Treatment Facility -Closure and Reclamation Plans - confirmation of conformity.pdf (179.11 KB) June 17, 2019 August 20, 2019
MV2019L1-0003 - KBL - YK Soil Treatment Facility - Closure and Reclamation P_V.4.pdf (4.22 MB) June 17, 2019 August 20, 2019
MV2019L1-0003 - KBL Environmental Ltd. - Closure and Reclamation Plan - Mar21-19.pdf (4.36 MB) March 21, 2019 March 25, 2019