Skip to main content

GNWT-INF - MV2017X0008

The continuous and ongoing operation and maintenance of the existing NWT Public Highway system within thepermit area along the Yellowknife Highway (NWT No.3) between kilometre 200 and kilometre 338.8 (end of Highway #3) and along the Ingraham Trail (NWT No.4) between kilometre 0 (lntersection with the Yellowknife Highway at km 337.3) and km 69.2 (Tibbitt Lake - the end of the Highway) Corridor and includes the Community Access Roads for Behchoko (Rae) and Dettah and other minor roads along the Yellowknife Highway -Ingraham Trail Corridor.
Uploaded On or After
Uploaded On or Before
Displaying 101 - 113 of 113
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2017X0008 - GNWT - INF - Inspection Report for March 13 2019 - GNWT Lands - Mar18-19.pdf (1.05 MB)
MV2017X0008 - GNWT - INF - Inspection Report - Geotechnical Drilling Inspection - March 18 2019.pdf (2.01 MB)
MV2017X0008 - GNWT-INF - Geotechnical Drilling Inspection for March 6 2019 - GNWT Lands - Mar7-19.pdf (3.29 MB)
MV2017X0008 - GNWT-INF - Inspection Report - August 28 2018.pdf (1.48 MB)
MV2017X0008 - GNWT-DOI - Inspection Report for July 9 2018 - GNWT Lands - Jul24-18.pdf (2.49 MB)
MV2017X0008 - GNWT-INF - Inspection Report for May 23 2018 - May30-18.pdf (2.77 MB)
MV2017X0008 - GNWT-INF - Inspection Report for May 25 2018 - GNWT Lands - May29-18.pdf (1.94 MB)
MV2017X0008 - GNWT-INF - Inspection Report for August 24 2017 - GNWT Lands - Sept7-17.pdf (2.77 MB)
MV2017X0008 - GNWT-INF - Inspection Report for July 26 20178 - GNWT Lands - Jul26-17.pdf (3.63 MB)
MV2017X0008 - GNWT-DOI - Inspection Report for July 6 2017 - Hwy 3 Quarry 272 - GNWT Lands - Jul20-17.pdf (3.16 MB)
MV2017X0008 - GNWT-Highways - Insepction Report for June 27 2017 - GNWT Lands - Jun30-17.pdf (1.64 MB)
Operations and Notifications
Document Received/Sent Uploaded
GNWT-INF - Request to Extend ORS Response Deadline - Mar7_23.pdf (105.35 KB)
GNWT-INF - Inspection Report - November 7, 2022 - Nov8_22.pdf (1.17 MB)