The Operation will consist of the following:The continuous and ongoing operation and maintenance of the existing NWT Public Highway system within thepermit area along the Yellowknife Highway (NWT No.3) between kilometre 200 and kilometre 338.8 (end of Highway #3) and along the Ingraham Trail (NWT No.4) between kilometre 0 (lntersection with the Yellowknife Highway at km 337.3) and km 69.2 (Tibbitt Lake - the end of the Highway) Corridor and includes the Community Access Roads for Behchoko (Rae) and Dettah and other minor roads along the Yellowknife Highway -Ingraham Trail Corridor and as listed under the Public Highways Act as Commissions Land for the Government of the NWT, and includes all highway and infrastructure: (i.e. roadway embankment maintenance, rehabilitation and reconstruction; bridge structures maintenance and replacement, culvert maintenance and replacement, establishment and maintenance of drainage channels, winter roads construction and maintenance). All maintenance and operations will be undertaken following the standards for highway maintenance as outlined in the Highway Maintenance Standards Manual, normal construction practices and in accordance with the various regulatory agencies, as applicable;
The Permit area will be two (2) kilometres in width, one (I) kilometre on each side of the existing publichighway/roadway centerline through the entire length of the permit corridor including access and minor roads as listed in the Public Highways Act.

To access existing or future quarry areas within and outside the two (2) kilometre corridor

To develop new or further develop existing borrow areas to obtain granular borrow materials, common materials, blast rock (including use of explosives), rip-rap, clay, sand and gravel, from areas outside the existing 60 metre wide Public ​Highway corridors through applications to DOL for Quarrying Permits

To carry out geotechnical investigations in the search for gravels and rock and for gathering preliminary engineering information for the design of foundations for roadways, bridges and other structures (as required)

To place and maintain granular stockpiles at existing or approved quarry sites for the purpose of ongoing operations and maintenance of the public highway system within the permit corridor;
To place temporary construction/work camps at existing quarry or previously developed sites within the permicorridor for the purpose of carrying out operations and maintenance activities, including refueling, on the public highway system and other roadways within the permit corridor;t
To temporarily store construction, operations and maintenance equipment, including fuel, at the various existing quarry or other previously developed sites within the permit corridor while carrying out these activities in the area;
To access water sources for the ongoing operations and maintenance for the public highway system within the permit corridor; To have right of access to one kilometre (1000 metres) on each side (left and right) to the public highway/roadwaycenter line for the purpose of carrying out granular and geotechnical investigations, quarry pit development. drainage channel construction, stockpiling granular and other construction materials and placement of temporary construction work camps;
To construct and maintain sand and sand/salt storae facilities at strategic locations along the designated highway corridor; and To construct, operate and maintain pullouts/rest areas at strategic locations along the designated highway corridor.

Documents

Displaying 1 - 57 of 57
E.g., 11/22/2019
E.g., 11/22/2019

1. Permit - Licence - Other Issuances

All Issuances
Document Received/Sent Uploaded
MV2017X0008 - GNWT-INF - Land Use Permit - Amendment Approved - Aug 20_19.pdf (520.91 KB) August 20, 2019 August 21, 2019
MV2017X0008 - GNWT-INF - Land Use Permit - Amendment - Staff Report and Comments - Aug 8_19.pdf (413.41 KB) August 20, 2019 August 21, 2019
MV2017X0008 - GNW - INF - Amendment Approval.pdf (546.23 KB) March 22, 2019 March 22, 2019
MV2017X0008 - GNWT - Dept of Transportation - Transboundary Determination - Staff Report - Apr 20-17.pdf (308.29 KB) April 20, 2017 April 28, 2017
MV2017X0008 - GNWT - Dept. of Transportation - Issuance - Staff Report and Comments - Apr20-17.pdf (7.4 MB) April 20, 2017 April 28, 2017
MV2017X0008 - GNWT - Dept. of Transportation - Issuance - Type A Land Use Permit - Apr20-17.pdf (1.51 MB) April 20, 2017 April 28, 2017
External Authorizations
Document Received/Sent Uploaded
MV2017X0008 - GNWT-INF - Issuance of QP 2019QP0005 - GNWT Lands - Apr24-19.pdf (279.91 KB) April 24, 2019 April 24, 2019
MV2017X0008 - GNWT-INF - Issuance of QP 2019QP0004 - GNWT Lands - Apr15-19.pdf (283.38 KB) April 15, 2019 April 16, 2019
MV2017X0008 - GNWT-INF - Receipt of QPA - GNWT Lands - Mar25-19.pdf (154.81 KB) March 25, 2019 April 11, 2019
MV2017X0008 - GNWT-INF - Receipt of QP Application - GNWT Lands - Feb27-19.pdf (159.98 KB) February 27, 2019 February 28, 2019
MV2017X0008 - GNWT-INF - QP Issuance Letter - 2018QP0025 - GNWT Lands - Aug9-18.pdf (680.9 KB) August 9, 2018 August 10, 2018
MV2017X0008 - GNWT - INF - QPFP VERIFICATION - Letter - GNWT - Lands -June26_18.pdf (482.58 KB) June 26, 2018 June 27, 2018
MV2017X008 - GNWT - INF - Quarry Permit Letter - 2018QP0023 - June26_18.pdf (447.75 KB) June 26, 2018 June 27, 2018
MV2017X0008 - GNWT-DOI - QPA Acknowledgement letter - GNWT Lands - Jun14-18.pdf (154.88 KB) June 14, 2018 June 14, 2018
MV2017X0008 - GNWT-DOI - Receipt of QP Application and Consultation Letter - GNWT Lands - May11-18.pdf (231.5 KB) May 11, 2018 May 14, 2018
MV2017X0008 - GNWT-INF - Issuance Letter for QP 2018QP0016 - GNWT Lands - Mar29-18.pdf (405.4 KB) March 29, 2018 March 29, 2018
MV2017X0008 - GNWT DOI - Quarry Permit Application - Consultation - Feb12-18.pdf (126.97 KB) February 12, 2018 February 12, 2018
MV2017X0008 - GNWT-INF - Receipt of QP Application and consultation - GNWT Lnds - Feb8-18.pdf (233.33 KB) February 8, 2018 February 9, 2018
MV2017X0008 - GNWT-INF - Final QP Return - Verification 2015QP0020 - GNWT Lands - Feb8-18.pdf (124.4 KB) February 8, 2018 February 9, 2018
MV2017X0008 - GNWT-DOT - QP Issuance letter 2017QP0012 - GNWT Lands - May12-17.pdf (411.23 KB) May 12, 2017 May 15, 2017
Modifications
Document Received/Sent Uploaded
MV2017X0008 - GNWT - Dept of Infrastructure - Acceptance - Name Change approval - May25-17.pdf (881.26 KB) May 25, 2017 June 6, 2017
MV2017X0008 - GNWT - Dept of Infrastructure - Name Change - Staff Report - May25-17.pdf (353.23 KB) May 25, 2017 June 6, 2017
MV2017X0008 - GNWT-INF - Notification of Name Change - GNWT-INF - May2-17.pdf (149.55 KB) May 2, 2017 May 8, 2017

2. Initial/Renewal Application

Application and Related Docs
Document Received/Sent Uploaded
MV2017X0008 - GNWT-DOT - Draft Conditions - Mar10-17.pdf (259.71 KB) March 10, 2017 March 10, 2017
MV2017X0008 - GNWT-DOT - Application Complete Letter - Mar10-17.pdf (348.97 KB) March 10, 2017 March 10, 2017
MV2017X0008 - GNWT-DOT - New Land Use Permit Application - Mar6-17.pdf (3.89 MB) March 6, 2017 March 6, 2017
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2017X0008 - GNWT-DOT - Request for Comments on New Land Use Permit App - Mar10-17.pdf (337.8 KB) March 10, 2017 March 15, 2017

3. Amendment Application

All Issuances
Document Received/Sent Uploaded
MV2017X0008 - GNWT - INF - Amendment - Staff Report and Comments Summary Tables - Mar22-19.pdf (1.01 MB) March 22, 2019 March 22, 2019
Application and Related Docs
Document Received/Sent Uploaded
MV2017X0008 - GNWT-INF - Amedment Application - Additional Information - Jun20-19.pdf (246.61 KB) June 20, 2019 June 24, 2019
MV2017X0008 - GNWT-INF - Amendment Application - Jun18-19.pdf (949.29 KB) June 18, 2019 June 19, 2019
MV2017X0008 - GNWT-INF - Application Incomplete Letter - Jun19 -19.pdf (169.73 KB) June 19, 2019 June 19, 2019
MV2017X0008 - GNWT-INF - Amendment Application - Additional information - Feb8-19.pdf (651.96 KB) February 8, 2019 February 8, 2019
MV2017X0008 - GNWT-INF - Amendment Application - Feb4-19.pdf (2.36 MB) February 4, 2019 February 6, 2019
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2017X0008 - GNWT-INF - Request for comments on the Amendment Application - Jul10-19.pdf (321.55 KB) July 10, 2019 July 12, 2019
Preliminary Screening
Document Received/Sent Uploaded
MV2017X0008 - GNWT-INF - Preliminary Screening Notification to Review Board - Aug 9_19.pdf (454.73 KB) August 9, 2019 August 9, 2019
MV2017X0008 - GNWT - INF - Amendment - Preliminary Screening.pdf (367.4 KB) March 22, 2019 March 22, 2019

5. Reports and Studies

Inspection Reports
Document Received/Sent Uploaded
MV2017X0008 - GNWT - INF - Inspection Photos - Pit Development Plan - Oct4-19 - Oct_719.pdf (3.2 MB) October 7, 2019 October 7, 2019
MV2017X0008 - GNWT-Higways -Inspection Report for August 7 2019 - GWNT Lands - Aug13-19.pdf (7.76 MB) August 13, 2019 August 14, 2019
MV2017X0008 - GNWT-INF - Highway 4 km 11 Quarry - Inspection Report for July 9 2019 - GNWT Lands - Jul11-19.pdf (1.76 MB) July 11, 2019 July 11, 2019
MV2017X0008 - GNWT-INF - Km55 Quarry - Inpsection Report for June 26 2019 - GNWT Lands - Jul9-19.pdf (3.82 MB) July 9, 2019 July 10, 2019
MV2017X0008 - GNWT-INF - Inspection Report for June 20 2019 - GNWT Lands - Jun27-19.pdf (2.37 MB) June 27, 2019 July 3, 2019
MV2017X0008 - GNWT-INF - Inspection Report for May 29 2019 - GNWT Lands - May31-19.pdf (1.74 MB) May 31, 2019 May 31, 2019
MV2017X0008 - GNWT-INF - Inspection Report for May 28 2019 - GNWT Lands - May29-19.pdf (4.06 MB) May 29, 2019 May 30, 2019
MV2017X0008 - GNWT-INF - Inspection report for April 25 2019 - Apr26-19.pdf (1.55 MB) April 26, 2019 May 3, 2019
MV2017X0008 - GNWT-INF - Inspection Report for April 25 2019 Inspection - GNWT Lands - Apr26-19.pdf (1.12 MB) April 26, 2019 May 1, 2019
MV2017X0008 - GNWT-iNF - Inspection Report for April 25 2019 - GNWT Lands - Apr26-19.pdf (1.55 MB) April 26, 2019 May 1, 2019
MV2017X0008 - GNWT - INF - Inspection Report for March 13 2019 - GNWT Lands - Mar18-19.pdf (1.05 MB) March 18, 2019 April 1, 2019
MV2017X0008 - GNWT - INF - Inspection Report - Geotechnical Drilling Inspection - March 18 2019.pdf (2.01 MB) March 18, 2019 March 18, 2019
MV2017X0008 - GNWT-INF - Geotechnical Drilling Inspection for March 6 2019 - GNWT Lands - Mar7-19.pdf (3.29 MB) March 7, 2019 March 11, 2019
MV2017X0008 - GNWT-INF - Inspection Report - August 28 2018.pdf (1.48 MB) September 4, 2018 September 4, 2018
MV2017X0008 - GNWT-DOI - Inspection Report for July 9 2018 - GNWT Lands - Jul24-18.pdf (2.49 MB) July 24, 2018 July 24, 2018
MV2017X0008 - GNWT-INF - Inspection Report for May 23 2018 - May30-18.pdf (2.77 MB) May 30, 2018 May 30, 2018
MV2017X0008 - GNWT-INF - Inspection Report for May 25 2018 - GNWT Lands - May29-18.pdf (1.94 MB) May 29, 2018 May 30, 2018
MV2017X0008 - GNWT-INF - Inspection Report for August 24 2017 - GNWT Lands - Sept7-17.pdf (2.77 MB) September 7, 2017 September 8, 2017
MV2017X0008 - GNWT-INF - Inspection Report for July 26 20178 - GNWT Lands - Jul26-17.pdf (3.63 MB) July 26, 2017 July 28, 2017
MV2017X0008 - GNWT-DOI - Inspection Report for July 6 2017 - Hwy 3 Quarry 272 - GNWT Lands - Jul20-17.pdf (3.16 MB) July 20, 2017 July 20, 2017
MV2017X0008 - GNWT-Highways - Insepction Report for June 27 2017 - GNWT Lands - Jun30-17.pdf (1.64 MB) June 30, 2017 July 4, 2017