The activities to be covered under the Land Use Permit (LUP} for the Glowworm Lake Project

will include:

1. Possible maintenance and operation of a temporary seasonal camp.

2. Fuel and equipment storage.

3. Geological and geophysical surveys.

4. Geochemical sampling.

5. Waterless RC drilling to test glacial stratigraphy.

6. Diamond drilling to test and delineate potential kimberlite targets.

7. Seasonal shutdown of the temporary camp.

8. Abandonment and restoration both ongoing and for final closure.

The LUP application will cover a period of five years, with a possible two year extension. During the operation of the exploration program, progressive restoration of field sample and drill sites will occur on an ongoing basis.

Over the length of the program, there will be approximately 25 diamond drill holes drilled per year to test KIM and geophysical targets; each with an average depth of approximately 250 m. The RC drilling will be used to test and sample the glacial stratigraphy down to bedrock and will consist of an approximate total of 200 RC holes to a maximum depth of 100 m.

At the end of the program, if a renewal is not sought, all unnecessary equipment will be backhauled to Yellowknife, NT and any structures dismantled will be either recycled or incinerated. The temporary camp site will be restored using industry and Canadian Council of Ministers of the Environment (CCME) best practices.

Documents

Displaying 1 - 34 of 34
E.g., 08/18/2019
E.g., 08/18/2019

1. Permit - Licence - Other Issuances

AN Storage
Document Received/Sent Uploaded
MV2017C0022- Dominion Diamond Holdings ULC - Name Change - Approval Letter - Feb22-18.pdf (553.95 KB) February 22, 2018 February 28, 2018
All Issuances
Document Received/Sent Uploaded
MV2017C0022 - Dominion Diamond Holdings Ltd- Issuance Letter with Permit-Conditions and RFD - Type A LUP - Jul6-17.pdf (3.03 MB) July 6, 2017 July 12, 2017
Modifications
Document Received/Sent Uploaded
MV2017C0022- Dominion Diamond Holdings ULC - Name Change - Staff Report - Feb22-18.pdf (174.14 KB) February 22, 2018 February 28, 2018
MV2017C0022 - Dominion Diamonds Holdings Ltd - Notice of Name Change - Jan15-18.pdf (289.42 KB) January 15, 2018 January 19, 2018
Security and Water Use Fees
Document Received/Sent Uploaded
MV2017C0022 - DDMU - Receipt of Amendment no 1 to ILOC - GNWT Lands - Apr6-18.pdf (309.12 KB) April 6, 2018 April 6, 2018
MV2017C0022 - Dominion Diamond Mines ULC - Name Change Info from GNWT Lands - Feb1-18.pdf (142.61 KB) February 1, 2018 February 2, 2018
MV2017C0022 - Dominion Diamond Holdings - Notice of Security Deposit posted -.pdf (194.25 KB) August 22, 2017 August 23, 2017
MV2017C0022 - Dominion Diamond Holdings Ltd. - Acknowledgement of Secuirty - Aug10-17.pdf (292.5 KB) August 10, 2017 August 10, 2017

2. Initial/Renewal Application

Application and Related Docs
Document Received/Sent Uploaded
MV2017C0022 - DDFL - Issuance - Staff Report and Comments - Jul6-17.pdf (2.73 MB) July 6, 2017 July 17, 2017
MV2017C0022 - Dominion Diamond Holdings Limited - Transboundary Determination - Staff Report - Jun22-17.pdf (294.37 KB) June 22, 2017 June 26, 2017
MV2017C0022 - DDHL - Draft Conditions - May31-17.pdf (229.63 KB) May 31, 2017 May 31, 2017
MV2017C0022 - Dominion Diamond - Application Complete Letter - May31-17.pdf (342.33 KB) May 31, 2017 May 31, 2017
MV2017C0022 - Dominion Diamond - Updated Application - 29 May 2017.pdf (3.54 MB) May 29, 2017 May 30, 2017
MV2017C0022 - Dominion Diamond - Security Estimate Worksheet - May29-17.pdf (74.18 KB) May 29, 2017 May 30, 2017
MV2017C0022 - Dominion Diamond - Application Incomplete Letter - May18-17.pdf (351.89 KB) May 18, 2017 May 19, 2017
MV2017C0022 - Dominion Diamond - New LUP Application - May12-17.pdf (2.43 MB) May 12, 2017 May 15, 2017
MV2017C0022 - Dominion Diamond - Receipt for New LUP Application Fee - C153025 - May12-17.pdf (169.13 KB) May 12, 2017 May 15, 2017
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2017C0022 - DDHL - Request for comments on New LUP Application - May31-17.pdf (441.37 KB) May 31, 2017 June 2, 2017
Preliminary Screening
Document Received/Sent Uploaded
MV2017C0022 - Dominion Diamond Holdings Ltd - Issuance - Preliminary Screening Report - Jul6-17.pdf (2.19 MB) July 6, 2017 July 12, 2017

5. Reports and Studies

6. Management Plans

Engagement Plan
Document Received/Sent Uploaded
MV2017C0022 - Dominion Diamond Holdings Ltd - Issuance - Approval of Engagement Plan - Type A LUP - Jul6-17.pdf (2.03 MB) July 6, 2017 July 12, 2017
MV2017C0022 - Dominion Diamond - Updated Application - Engagement Plan - May29-17.pdf (1.21 MB) May 29, 2017 May 30, 2017
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2017C0022 - Dominion Diamond Holdings Ltd - Issuance - Approval of SCP - Type A LUP - Jul6-17.pdf (2.03 MB) July 6, 2017 July 12, 2017
MV2017C0022 - Dominion Diamond Holdings Limited - Spill Contingency Plan - V2 - Jun26-17.pdf (155.07 KB) June 26, 2017 June 27, 2017
MV2017C0022 - Dominion Diamond - Updated Application - Spill Contingency Plan - May29-17.pdf (1.04 MB) May 29, 2017 May 30, 2017
Waste Management Plan
Document Received/Sent Uploaded
MV2017C0022 - Dominion Diamond Holdings Ltd - Issuance - Approval of WMP - Type A LUP - Jul6-17.pdf (2.03 MB) July 6, 2017 July 12, 2017
MV2017C0022 - Dominion Diamond - Updated Application - Waste MGMT Plan - 29 May 2017.pdf (434.26 KB) May 29, 2017 May 30, 2017

9. GIS Data

GIS Data
Document Received/Sent Uploaded
MV2017C0022 - Dominion Diamond - Glowworm Property NWT - Lambert- GIS Data - May16-17.zip (86.22 KB) May 16, 2017 May 16, 2017