The 'operation'will consist of the following:
The continuous and ongoing operation and maintenance of the existing NWT Public Highway system within the area along the Mackenzie Highway between kilometre 278 and kilometre 800 which includes community access roads for Fort Simpson,Jean Marie River, Trout Lake,Willow Lake River Settlement,
Wrigley as listed under the Highways Act, and Includes highway and airport Infrastructure: (I.e. roadway embankment,bridge, and culvert maintenance and replacement, winter road and Ice bridge
construction and maintenance,airstrip surfacing and Ferry Services and Operations).All maintenance and operations will be undertaken following the Standards for Highway Maintenance as outlined in
the Highway Maintenance Management System Manual,normalconstruction practices and in accordance
with the various regulatory agencies, as applicable;
The permit area will be two (2) kilometres in width, one (1) kilometre on each side of the existing public highway/roadway centerline through the entire length of the permit area including access roads;
To develop and obtain granular borrow materials, common materials, blast rock,rip-rap,clay,sand and
gravel,from: areas outside the existing 60 metre-wide Public Highway Corridor through applications
to the Department of Lands for Quarry Permits;
To place and maintain granular stockpiles at existing or approved quarry sites for the purpose of
ongoing maintenance and operations of the public highway system within the permit area;
To place temporary construction/work camps at existingquarry or previously developed sites within
the permit area for the purpose of carrying out maintenance and operations of the roadways within
the permit area;
To temporarily store maintenance and operations equipment at the various existing quarry or other
previously developed sites within the permit area while carryingout these activities in the area;
To access water sources,as approved,for the ongoing maintenance and operations of the public highway system within the permit area; and,
To have right of access and priority status within one kilometer (1000 metres) left and right of the roadwaycentre line of the highway corridor for the purpose of quarry pit development and drainage channel
construction.

Documents

Displaying 1 - 54 of 54
E.g., 07/18/2019
E.g., 07/18/2019

1. Permit - Licence - Other Issuances

All Issuances
Document Received/Sent Uploaded
MV2016E0006 - GNWT-DOT - Issuance - Type A Land Use Permit with conditions - Jun9-16.pdf (361.38 KB) June 8, 2016 June 8, 2016
External Authorizations
Document Received/Sent Uploaded
MV2016E0006 - GNWT -INF - Final QP Verification - 2016QP0012 - GNWT Lands - Jun28-19.pdf (116.59 KB) June 28, 2019 July 3, 2019
MV2016E0006 - GNWT-INF - Final QP Verification - 2016QP0012 - GNWT Lands - Jun28-19.pdf (116.59 KB) June 28, 2019 July 3, 2019
MV2016E0006 - GNWT-INF - Issuance of QP 2019QP0007 - GNWT Lands - Apr30-19.pdf (438.9 KB) April 30, 2019 May 6, 2019
MV2016E0006 - GNWT-INF - Issuance of QP 2019QP0008 - GNWT Lands - Apr30-19.pdf (395.85 KB) April 30, 2019 May 6, 2019
MV2016E0006 - GNWT-INF - Issuance of 2019QP0007 - GNWT Lands - Apr30-19.pdf (204.74 KB) April 30, 2019 May 1, 2019
MV2016E0006 - GNWT-INF - Final QP Return - 2015QP0014 - Verification - GNWT Lands - Aug9-18.pdf (85.02 KB) August 9, 2018 August 10, 2018
MV2016E0006 - GNWT DOI - Issuance of QP 2018QP0008 - GNWT Lands - Feb22-18.pdf (426.49 KB) February 22, 2018 February 23, 2018
MV2016E0006 - GNWT-INF - Quarry Permit Issuance - 2017QP0027 - GNWT Lands - Sept12-17.pdf (414.48 KB) September 12, 2017 September 13, 2017
MV2016E0006 - GNWT - INF - Final PQ Return - GNWT Lands - Aug16-17.pdf (121.72 KB) August 16, 2017 August 16, 2017
MV2016E0006 - GNWT-DOT - New QP 2016QP0029 Issuance - GNWT Lands - Oct25-16.pdf (1.12 MB) October 25, 2016 October 25, 2016
MV2008E0033 MV2016E0006 - GNWT-DOT - Notice of QP transfer from expired to active LUP - GNWT Lands - Aug4-16.pdf (39.87 KB) August 3, 2016 August 3, 2016
Modifications
Document Received/Sent Uploaded
MV2016E0006 - GNWT - Dept of Infrastructure - Acceptance - Name Change - May25-17.pdf (748.45 KB) May 25, 2017 June 6, 2017
MV2016E0006 - GNWT - Dept of Infrastructure - Name Change - Staff Report - May25-17.pdf (352.57 KB) May 25, 2017 June 6, 2017

2. Initial/Renewal Application

Application and Related Docs
Document Received/Sent Uploaded
MV2016E0006 - GNWT-DOT - Issuance - Staff Report and Comments - Jun9-16.pdf (735.74 KB) June 8, 2016 June 8, 2016
MV2016E0006 - GNWT-DOT - Application Complete Letter - May3-16.pdf (77.03 KB) May 3, 2016 May 3, 2016
MV2016E0006 - GNWT-DOT - Draft Conditions - May3-16.pdf (321.93 KB) May 3, 2016 May 3, 2016
MV2016E0006 - GNWT-DOT - Additional information - May3-16.pdf (82.14 KB) May 3, 2016 May 3, 2016
MV2016E0006 - GNWT-DOT - Additional Information - Apr28-16.pdf (1.49 MB) April 27, 2016 April 27, 2016
MV2016E0006 - GNWT-DOT - Application Incomplete Letter - Apr25-16.pdf (120.89 KB) April 25, 2016 April 25, 2016
MV2016E0006 - GNWT-DOT - New LUP Application - Apr18-16.pdf (5.77 MB) April 18, 2016 April 18, 2016
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2016E0006 - GNWT-DOT - Request for comments on New LUP Application - May3-16.pdf (448.01 KB) May 2, 2016 May 2, 2016

5. Reports and Studies

Inspection Reports
Document Received/Sent Uploaded
MV2016E0016 - GNWT-INF -Highway 1 Km 327 - Inspection Report for May 29 2019 - GNWT Lands - Jun12-19.pdf (1.01 MB) June 12, 2019 July 3, 2019
MV2016E0016 - GNWT-INF -Highway 1 Km 313 - Inspection Report for May 28 2019 - GNWT Lands - Jun13-19.pdf (1.13 MB) June 13, 2019 July 3, 2019
MV2016E0016 - GNWT-INF - Highway 1 Km 376 - Inspection Report for May 28 2019 - GNWT Lands - Jun13-19.pdf (808.25 KB) June 13, 2019 July 3, 2019
MV2016E0016 - GNWT-INF - Highway 1-KM 414 - Inspection Report for May 28 2019 - GNWT Lands - Jun13-19.pdf (1.34 MB) June 13, 2019 July 3, 2019
MV2016E0016 - GNWT-INF -Highway 1 Km 545 - Inspection Report for May 7 2019 - GNWT Lands - Jun11-19.pdf (1013.4 KB) June 11, 2019 July 3, 2019
MV2016E0016 - GNWT-INF -Highway 1 Km 533 - Inspection Report for May 7 2019 - GNWT Lands - Jun11-19.pdf (1.17 MB) June 11, 2019 July 3, 2019
MV2016E0016 - GNWT-INF -Highway 1 Km 488 - Inspection Report for May 7 2019 - GNWT Lands - May31-19.pdf (1.15 MB) May 31, 2019 July 3, 2019
MV2016E0016 - GNWT-INF -Highway 1 Km 518 - Inspection Report for May 6 2019 - GNWT Lands - Jun12-19.pdf (886.26 KB) June 12, 2019 July 3, 2019
MV2016E0016 - GNWT-INF -Highway 1 Km 488 - Inspection Report for May 7 2019 - GNWT Lands - Jun11-19.pdf (1.12 MB) June 11, 2019 July 3, 2019
MV2016E0016 - GNWT-INF -Highway 1 Km 388-8 - Inspection Report for May 28 2019 - GNWT Lands - Jun12-19.pdf (922.4 KB) June 12, 2019 July 3, 2019
MV2016E0016 - GNWT-INF -Highway 1 Km 365 - Inspection Report for May 28 2019 - GNWT Lands - Jun12-19.pdf (884 KB) June 12, 2019 July 3, 2019
MV2016E0006 - GNWT INF - Inspection Report - Winter Road - Wrigley to Blackwater River - Inspection Report-June13-17.pdf (4.74 MB) June 14, 2018 June 15, 2018
MV2016E0016 - GNWT-DOI - Inspection Report for March 28 2018 - GNWT Lands - Apr27-18.pdf (1.04 MB) April 27, 2018 April 30, 2018
MV2016E0006 - GNWT-INF - Inspection Report for arch 15 2018 - GNWT Lands - Mar23-18.pdf (633.67 KB) March 23, 2018 March 28, 2018
MV2016E0006 - GNWT-INF - Inspection Report for March 15 2108 KM 388 Quarry - GNWT Lands - Mar22-18.pdf (504.8 KB) March 22, 2018 March 28, 2018
MV2016E0006 - GNWT-INF - Inspection Report for March 2 2018 - GNWT Lands - Mar20-18.pdf (695.65 KB) March 20, 2018 March 21, 2018
MV2016E0006 - GNWT DOI - JMR Access - Inspection Report for July 18 2017 - GNWT Lands - Sept7-17.pdf (1.21 MB) September 7, 2017 September 8, 2017
MV2016E0006 - GNWT DOI - Km 371-457 - Inspection Report for July 18 2017 - GNWT Lands - Sept7-17.pdf (575.3 KB) September 7, 2017 September 8, 2017
MV2016E0006 - GNWT DOI - KM 376 camp and 2015QP0014 - Inspection Report for July 18 2017 - GNWT Lands - Sept7-17.pdf (1.54 MB) September 7, 2017 September 8, 2017
MV2016E0006 - GNWT DOI - KM 414 Quarry - Inspection Report for July 18 2017 - GNWT Lands - Sept7-17.pdf (1.12 MB) September 7, 2017 September 8, 2017
MV2016E0006 - GNWT DOI - Mackenzie to Fort Simpson - Inspection Report for June 15 2017 - GNWT Lands - Sept7-17.pdf (3.47 MB) September 7, 2017 September 8, 2017
MV2016E0006 - GNWT-DOI - Wrigley to Mackenzie River - Inspection Report for June 13 2017 - GNWT Lands - Sept7-17.pdf (1.04 MB) September 7, 2017 September 8, 2017
MV2016E0006 - GNWT - DOT - Inspection Report -Feb17-17.pdf (746.18 KB) March 31, 2017 April 3, 2017
MV2016E0006 - GNWT- DOT - Inspection Report -Mar22-17.pdf (586.92 KB) March 31, 2017 April 3, 2017
MV2016E0006 - GNWT-DOT - Km 436-5 Quarry Asphalt Clean up - Inspection Report for October 26 2016 - GNWT Lands - Dec2-16.pdf (932.23 KB) November 30, 2016 November 30, 2016
MV2016E0006 - GNWT-DOT- Inspection Report for October 26 2016 - HWY construction - GNWT Lands - Dec1-16.pdf (681.07 KB) November 30, 2016 November 30, 2016
MV2016E0006 - GNWT-DOT - Inspection Report for October 26 2016 - 2015QP0014 - GNWT Lands - Dec1-16.pdf (774.25 KB) November 30, 2016 November 30, 2016
MV2016E0006 - GNWT-DOT - Inspection Report for October 27 2016 - 2016QP0012 Km 518 - GNWT Lands - Dec1-16.pdf (625.53 KB) November 30, 2016 November 30, 2016
MV2016E0006 - GNWT-DOT - Environmental Inspection Report for October 3 2016 - GNWT Lands - Oct11-16.pdf (2.05 MB) October 10, 2016 October 10, 2016
MV2016E0006 - GNWT-DOT - Inspection Report for July 5 2016 - GNWT Lands - Aug11-16.pdf (1.31 MB) August 10, 2016 August 10, 2016
Operations and Notifications
Document Received/Sent Uploaded
MV2016E0006 - GNWT-DOT - AIA Reports - Dec1-16.pdf (16.66 MB) November 30, 2016 November 30, 2016
MV2016E0006 MV2016E0025 - GNWT-DOT - AIA Reports - Oct26-16.pdf (10.99 MB) October 25, 2016 October 25, 2016