Enbridge Pipelines (NW) Inc. - MV2013P0011

Off right-of-way activities to operate and maintain the Norman Wells (Line 21) pipeline from Norman Wells, NT to the Alberta/Northwest Territories border. Permitted activities include use and maintenance of cleared fireguard areas, seasonal trails and shoo flies, all-weather roads, campsites, workspaces, borrow sites, an airstrip, and application of herbicides. 

Previously permitted under MV2006P0018.

Transboundary with Dehcho Region and the Sahtu and Metis Settlement Area.

Documents

Displaying 1 - 5 of 5
Uploaded On or After
Uploaded On or Before
5. Reports and Studies
Other
Document Received/Sent Uploaded
MV2013P0011 - Enbridge - TEK Summary - Land use features associated with Line 21 - Dec20-13.pdf (2.52 MB) December 19, 2013 December 19, 2013
MV2013P0011 - Enbridge - Withdrawal of request for confidential filing of remediation reports - Dec9-13.pdf (117.1 KB) December 8, 2013 December 8, 2013
MV2013P0011 - Enbridge Pipeline - Remediation Report - Nov26-13.pdf (4.52 MB) November 25, 2013 November 25, 2013
MV2013P0011 - Enbridge - Remedial Excavation Plan - Nov26-13.pdf (1.22 MB) November 25, 2013 November 25, 2013
MV2013P0011 - Enbridge - Report on 2011 KP 380.4 Emergency Land Use - Nov26-13.pdf (102.74 KB) November 25, 2013 November 25, 2013