Enbridge Pipelines (NW) Inc. - MV2013P0011

Off right-of-way activities to operate and maintain the Norman Wells (Line 21) pipeline from Norman Wells, NT to the Alberta/Northwest Territories border. Permitted activities include use and maintenance of cleared fireguard areas, seasonal trails and shoo flies, all-weather roads, campsites, workspaces, borrow sites, an airstrip, and application of herbicides. 

Previously permitted under MV2006P0018.

Transboundary with Dehcho Region and the Sahtu and Metis Settlement Area.

Documents

Displaying 1 - 100 of 148
Uploaded On or After
Uploaded On or Before
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2013P0011 - Enbridge Pipelines - Extension - Approval Letter - May24-18.pdf (347.41 KB) May 24, 2018 May 29, 2018
MV2013P0011 - Enbridge - LUP Issuance letter with Conditions - Jul18-13.pdf (3.07 MB) July 17, 2013 July 17, 2013
External Authorizations
Document Received/Sent Uploaded
MV2013P0011 - Enbridge - Inspectors Authorization to Utilize Temporary Access on the North Slope - Jan 6_17.pdf (634.27 KB) January 5, 2017 January 5, 2017
Final Plan and Clearance
Document Received/Sent Uploaded
MV2013P0011 - Enbridge - Inspector Recommendation - Sahtu - July 22_21.pdf (120.35 KB) July 22, 2021 July 22, 2021
MV2013P0011 - Enbridge - Inspector Recommendation - Dehcho - July 22_21.pdf (122.32 KB) July 22, 2021 July 22, 2021
MV2013P0011 - Enbridge - Final Plan Updated - July 9_21.pdf (1.03 MB) July 9, 2021 July 21, 2021
MV2013P0011 - Enbridge - Final Plan - Oct 16_20.pdf (22.82 KB) October 16, 2020 October 19, 2020
Security and Water Use Fees
Document Received/Sent Uploaded
MV2013P0011 - Enbridge - Security Template - July 18_13.xlsx (43.19 KB) July 18, 2013 June 12, 2020
MV2013P0011 - Enbridge - AANDC acknowledge of security depaosit - Oct18-13.pdf (93.93 KB) October 21, 2013 October 21, 2013
MV2013P0011 - Enbridge - AANDC acknowledges receipt of security deposit - Oct18-13.pdf (71.75 KB) October 17, 2013 October 17, 2013
MV2013P0011 - Enbridge - Posting of security deposit - AANDC - Oct11-13.pdf (262.47 KB) October 10, 2013 October 10, 2013
MV2013P0011 - Enbridge - AANDC response to land use fees letter - Jul9-13.pdf (521.88 KB) July 9, 2013 July 9, 2013
MV2013P011 - Enbridge - Letter to AANDC re Land use fees - Jun26-13.pdf (73 KB) June 25, 2013 June 25, 2013
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2013P0011 - Enbridge - Updated Request for withdrawal of select land use areas - Jul18-13.pdf (419.56 KB) July 17, 2013 July 17, 2013
MV2013P0011 - Enbridge - Staff Report for Type A LUP Renewal - Jul18-13.pdf (2.65 MB) July 17, 2013 July 17, 2013
MV2013P0011 - Enbridge - Request for withdrawal of select land use areas - Jul17-13.pdf (166.83 KB) July 16, 2013 July 16, 2013
MV2013P0011 - Enbridge - Update on status of Traditional Ecological knowledge studies - Jul10-13.pdf (44.88 KB) July 10, 2013 July 10, 2013
MV2013P0011 - Enbridge - Status of access discussions for Sahtu private lands in Tulita District - Jul10-13.pdf (74.51 KB) July 9, 2013 July 9, 2013
MV2013P0011 - Enbridge - Update on response to Engagement plan - Jul9-13.pdf (78.85 KB) July 8, 2013 July 8, 2013
MV2013P0011 - Enbridge - Update on NEB process for pipeline abandonment financial issues - Jul8-13.pdf (73.79 KB) July 7, 2013 July 7, 2013
MV2013P0011 - Enbridge - Additional information on campsite buildings and fuel storage - Jul3-13.pdf (268.12 KB) July 2, 2013 July 2, 2013
MV2013P0011 - Enbridge - LUP Application - Additional information including revised Appendix D for SCP - Jun13-13.pdf (878.29 KB) June 12, 2013 June 12, 2013
MV2013P0011 - Enbridge - LUP Application deemed complete- Jun7-13.pdf (89.47 KB) June 6, 2013 June 6, 2013
MV2013P0011 - Enbridge - LUP Application - Additional information including revised appendix VI - Jun6-13.pdf (1.01 MB) June 5, 2013 June 5, 2013
MV2013P0011 - Enbridge - Staff Report for consideration of Confidential Document - Jun6-13.pdf (103.06 KB) June 5, 2013 June 5, 2013
MV2013P0011 - Enbridge - LUP Application - Additional Information including revised Appendix I - Jun6-13.pdf (964.11 KB) June 5, 2013 June 5, 2013
MV2013P0011 - Enbridge - Confidentiality Request Approved - Jun6-13.pdf (91.94 KB) June 5, 2013 June 5, 2013
MV2013P0011 - Enbridge - Receipt for LUP Application and Land Use fees - May29-13.pdf (57.58 KB) May 28, 2013 May 28, 2013
MV2013P0011 - Enbridge - New LUP Application - May29-13.pdf (3.28 MB) May 28, 2013 May 28, 2013
MV2013P0011 - Enbridge - Engagement Record and Plan - May29-13.pdf (2.74 MB) May 28, 2013 May 28, 2013
MV2013P0011 - Enbridge - Spill Contingency Plan no Appendix F - May29-13.pdf (3.81 MB) May 28, 2013 May 28, 2013
MV2013P0011 - Enbridge - Waste Management Plan no Appendix A - May29-13.pdf (3.17 MB) May 28, 2013 May 28, 2013
MV2013P0011 - Enbridge - Maps for SCP Appendix F and WMP Appendix A - May29-13.pdf (30.31 MB) May 28, 2013 May 28, 2013
MV2013P0011 - Enbridge - LUP Application Maps - Version 4 - Part 2 - Apr 2_13.pdf (11.64 MB) April 1, 2013 April 1, 2013
MV2013P0011 - Enbridge - LUP Application Maps - Version 4 - Part 1 - Apr 2_13.pdf (9.07 MB) April 1, 2013 April 1, 2013
Preliminary Screening
Document Received/Sent Uploaded
MV2013P0011 - Enbridge - Preliminary Screening exemption approved - Jul18-13.pdf (1.15 MB) July 17, 2013 July 17, 2013
MV2013P0011 - Enbridge - Staff Report for Preliminary Screening Exemption - Jul18-13.pdf (442.89 KB) July 17, 2013 July 17, 2013
MV2002P0009 - Enbridge - Preliminary screening for Dehcho portion - Sep9-02.pdf (665.45 KB) September 8, 2002 September 8, 2002
N96P631 - IPL - Preliminary screening for Norman Wells to Blackwater River - Sep13-96.pdf (517.96 KB) September 12, 1996 September 12, 1996
N96P632 - IPL - Preliminary screening for Dehcho - Sep13-96.pdf (196.55 KB) September 12, 1996 September 12, 1996
3. Amendment Application
Application and Related Docs
Document Received/Sent Uploaded
MV2013P0011 - Enbridge Pieplines -Extension Request - Staff Report and Comments - May24-18.pdf (443.81 KB) May 24, 2018 May 29, 2018
4. Permit Extension Request
Application and Related Docs
Document Received/Sent Uploaded
MV2013P0011 - Enbridge - Extension Request - Engagement Summary - April 4_18.pdf (77.09 KB) April 4, 2018 April 4, 2018
MV2013P0011 - Enbridge - Extension Request - Mar 29_18.pdf (132.9 KB) March 29, 2018 April 3, 2018
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2013P0011 - Enbridge Pipelines - Request for comments on Extension Request - Apr17-18.pdf (101.8 KB) April 17, 2018 April 17, 2018
MV2013P0011 - Enbridge Pipelines - Request for comments on LUP Extension Request - Apr7-18.pdf (374.85 KB) April 7, 2018 April 7, 2018
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
MV2013P0011 - Enbridge Pipelines - 2019 Annual Report - June 8_20.pdf (41.78 KB) June 8, 2020 June 8, 2020
MV2013P0011 - Enbridge Pipelines - 2018 Annual Report - June 6_19.pdf (155.45 KB) June 6, 2019 June 6, 2019
MV2013P0011 - Enbridge Pipelines - 2017 Annual Report - June 19_18.pdf (139.68 KB) June 19, 2018 June 19, 2018
MV2013P0011 MV2012L8-0008 - Enbridge Pipelines - 2016 Annual Report - Nov 29_17.pdf (137.45 KB) November 29, 2017 November 29, 2017
MV2013P0011 MV2012L8-0008 - Enbridge Pipelines - 2015-16 Annual Reports - Nov3-16.pdf (391.5 KB) November 2, 2016 November 2, 2016
MV2013P0011 - Enbridge Pipelines - 2014 Annual Report - Staff Report and Comments - Aug27-15.pdf (394.85 KB) August 26, 2015 August 26, 2015
MV2013P0011 - Enbridge Pipelines - 2014 Annual Report acceptance letter - Aug27-15.pdf (96.32 KB) August 26, 2015 August 26, 2015
MV2013P0011 - Enbridge Pipeline - 2014 Annual Report - Aug12-15.pdf (92.83 KB) August 11, 2015 August 11, 2015
MV2013P0011 - Enbridge - Response to Reviewer Comments on Annual Report - Aug 12_15.pdf (64.31 KB) August 11, 2015 August 11, 2015
MV2013P0011 - Enbridge - Request for comments on 2014 Annual Report submission - Jul14-15.pdf (177.79 KB) July 13, 2015 July 13, 2015
MV2013P0011 - Enbridge - 2014-15 Annual Report - Jun 30_15.pdf (3.42 MB) June 29, 2015 June 29, 2015
MV2013P0011 - Enbridge - 2013-14 Annual Report Accepted - Oct9-14.pdf (58.06 KB) October 8, 2014 October 8, 2014
MV2013P0011 - Enbridge Pipelines Inc. - 2013-14 Annual Report - Staff Report Oct 9-14.pdf (231.27 KB) October 8, 2014 October 8, 2014
MV2013P0011 - Enbridge - Request for comments on 2013-2014 Annual Report - Jul7-14.pdf (330.57 KB) July 6, 2014 July 6, 2014
MV2013P0011 - Enbridge - 2013-14 Annual Report - Jun30-14.pdf (257.29 KB) July 1, 2014 July 1, 2014
Inspection Reports
Document Received/Sent Uploaded
MV2013P0011 - Enbridge - Mar 30, 2020 Inspection Report - April 22_20.pdf (1.14 MB) April 22, 2020 April 22, 2020
MV2013P0011 - Enbridge - Mar 31, 2020 Inspection Report - April 22_20.pdf (1.05 MB) April 22, 2020 April 22, 2020
MV2013P0011 - Enbridge - Feb 20, 2020 Inspection Report - Feb 26_20.pdf (754.81 KB) February 26, 2020 February 26, 2020
MV2013P0011 - Enbridge - Feb 20, 2020 Inspection Report - Feb 25_20.pdf (1.44 MB) February 25, 2020 February 25, 2020
MV2013P0011 - Enbridge Pipelines - Inspection Report for June 14 2019 - GNWT Lands - Jul31-19.pdf (1.11 MB) July 31, 2019 August 1, 2019
MV2013P0011 - Enbridge Pipelines NW Inc - Inspection Report for June 28 2018 - GNWT Lands - Jul20-18.pdf (741.45 KB) July 20, 2018 August 8, 2018
MV2013P0011 - Enbridge Pipelines - Inspection Report for March 28 2018 - GNWT Lands - Apr27-18.pdf (903.87 KB) April 27, 2018 April 27, 2018
MV2013P0011 - Enbridge Pipelines - Inspection Report for March 21 2018 - GNWT Lands - Mar26-18.pdf (786.59 KB) March 26, 2018 March 28, 2018
MV2013P0011 MV2017P0013- Enbridge Pipelines - Response to March 2018 inspection reports - Mar27-18.pdf (63 KB) March 27, 2018 March 28, 2018
MV2013P0011 - Enbridge Pipelines - Inspection Report for August 8 2017 - GNWT Lands - Sept21-17.pdf (919.48 KB) September 21, 2017 October 4, 2017
MV2013P0011 - Enbridge - Feb 27, 2017 Inspection Report - Mar 31_17.pdf (925.86 KB) March 31, 2017 April 6, 2017
MV2013P0011 - Enbridge - Mar 22, 2017 Inspection Report - Mar 31_17.pdf (1016.32 KB) March 31, 2017 April 6, 2017
MV2013P0011 - Enbridge Pipelines - Inspection Report for February 17 2017 - GNWT Lands - Mar7-17.pdf (673.81 KB) March 7, 2017 March 8, 2017
MV2013P0011 - Enbridge Pipelines - Inspection Report for January 16 2017 - GNWT Lands - Jan20-17.pdf (824.85 KB) January 20, 2017 January 20, 2017
MV2013P0011 - Enbridge - Jan 6, 2017 Inspection Report - Jan 17_17.pdf (806.38 KB) January 15, 2017 January 15, 2017
MV2013P0011 -Enbridge Pipelines - Inspection Report for December 20 2016 - GNWT Lands - Dec21-16.pdf (841.45 KB) December 21, 2016 December 21, 2016
MV2013P0011 - Enbridge - Dec 2, 2016 Inspection Report - Dec 12_16.pdf (1.42 MB) December 11, 2016 December 11, 2016
MV2013P0011 - Enbridge Pipelines - Inspection Report for December 2 2016 - GNWT Lands - Dec12-16.pdf (1018.44 KB) December 11, 2016 December 11, 2016
MV2013P0011 - Enbridge - Mackenzie to Blackwater ROW - Inspection Report for October 18 2016 - GNWT Lands - Nov28-16.pdf (903.53 KB) November 28, 2016 November 28, 2016
MV2013P0011 - Enbridge Pipelines Inc - Inspection Report for November 25 2016 - GNWT Lands - Nov26-16.pdf (1.21 MB) November 25, 2016 November 25, 2016
MV2013P0011 - Enbridge Pipelines - Environmental Inspection Report for June 1 2016 - GNWT Lands - Oct13-16.pdf (1.16 MB) October 12, 2016 October 12, 2016
MV2013P0011 - Enbridge Pipelines - Inspection Report for March 17 2016 - GNWT Lands - May16-16.pdf (570.53 KB) May 15, 2016 May 15, 2016
MV2013P0011 - Enbridge Pipeline - August 19-15 Inspection Report - GNWT Lands - Sept1-15.pdf (1.44 MB) August 31, 2015 August 31, 2015
MV2013P0011 - Enbridge Pipelines -April 27 2015 Inspection Report - GNWT Lands - Apr28-15.pdf (1.84 MB) April 28, 2015 April 28, 2015
MV2013P0011 - Enbridge - May 16 2014 Inspection Report - GNWT Lands - May21-14.pdf (535.62 KB) May 21, 2014 May 21, 2014
MV2013P0011 - Enbridge Pipeline - March 4 2014 Inspection Report - May2-14.pdf (577.86 KB) May 2, 2014 May 2, 2014