Skip to main content

Canadian Zinc Corporation - MV2008L2-0002

MV2008T0012 and MV2008D0014     Mining Licence: Operation of mine and mill processing 1200 tonne/day supported by a camp for 110 personnel during normal operations, and up to 150 personnel during construction/advanced exploration.  
Uploaded On or After
Uploaded On or Before
Displaying 101 - 200 of 335
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV08L2-02 Request for Reviews July14-08.pdf (217.36 KB)
Environmental Assessment
Document Received/Sent Uploaded
MV2008L2-0002 - Application Referred to EA - Sep18-08.pdf (1.27 MB)
Inspection Reports
Document Received/Sent Uploaded
Appendix 18B Golder Flood Protection Inspection_Aug 19 09_fi.pdf (4.62 MB)
Other
Document Received/Sent Uploaded
MV2008L2-0002 - CZC - Revised work plan and document submission dates for regulatory process - Sept12-12.pdf (476.04 KB)
MV2008L2-0002 MV2008T0012 MV2008D0014 - CZN - Work Plan Sept11-12.pdf (54.85 KB)
MV2008L2-0002 - CZC - No Comment on application - ENR - Sept7-12.pdf (30.94 KB)
MV2008L2-0002 - Letter to MVLWB re Revised Workplan for WL Process - Aug27 -12.pdf (93.5 KB)
MV2008L2-0002 - CZN - Meeting Summary CZN and MVLWB_June 27 2012 - Jul23-12.pdf (175.87 KB)
MV2008L2-0002 - Minister response to EA - Jun18-12.pdf (366.92 KB)
MV2008L2-0002 - Request for review and comments - May15-12.pdf (439.81 KB)
MV2008L2-0002 - Directive and Work Plan - May11-12.pdf (1.7 MB)
Appendix S Golder response to NRC 2-2 i.pdf (48.76 KB)
Appendix R Stream Crossing Photos.pdf (1.02 MB)
Appendix M NHC analysis of streamflow trends 25 Oct 2010.pdf (65.18 KB)
Appendix N RGC Response to Second Round of IRs.pdf (2.11 MB)
Appendix O Water Quality Monitoring and AEMP.pdf (173.21 KB)
Appendix P Water Licence Approach.pdf (31.52 KB)
Appendix L NHC Exfiltration Trench Mixing - DRAFT 2011-02-11.pdf (882.1 KB)
Appendix I Spill Assessment and Contingency Planning.pdf (85.79 KB)
Appendix J TOR - Technical Advisory Committee.pdf (15.59 KB)
Appendix K Draft WMMP.pdf (401.09 KB)
Appendix F (revised) Water Balance and Water Quality.pdf (1.69 MB)
Appendix F Water Balance and Water Quality.pdf (867.27 KB)
Appendix G Hatfield Responses to IRs.pdf (210.34 KB)
Appendix D Assessment of effects - Hatfield.pdf (947.82 KB)
Appendix E NHC exfiltration outfall hydraulic design details.pdf (792.51 KB)
Appendix B Preliminary Estimate of Water Consumption for Ac.pdf (153.85 KB)
Appendix C Winter_Road_2010_0KM-72KM.pdf (1.3 MB)
Appendix C Winter_Road_2010_136KM-180KM.pdf (432.66 KB)
Appendix C Winter_Road_2010_72KM-136KM.pdf (1018.9 KB)
Appendix A IR2s.pdf (2.46 MB)
SeismicData.pdf (631.3 KB)
Draft Closure and Reclamation Plan Feb 22 DH_final.pdf (174.89 KB)
GenSetSpecs.pdf (3.02 MB)
NWH Field Trip 2009 Final Memo 14 aug 2009.pdf (1.67 MB)
Appendix 9_6.17.1_Water Balance_final.pdf (114.98 KB)
CZNCodeofEthics-Final210.pdf (43.62 KB)
Appendix 6 ER-0001 RevPAwatertreat.pdf (1012.06 KB)
Appendix 7 SRC 10432-1E10 Canadian Zinc_Mar_2010_final.pdf (1006.11 KB)
Appendix 30 HR Management Plan Prairie CreekJAN11_final.pdf (146.84 KB)
Appendix 32 Wildlife Management Plan.pdf (318.53 KB)
Appendix 33 MSDS_final.pdf (83.08 KB)
Appendix 4 PrairieCreek Paste Characterization Report_Jan 27.pdf (1.93 MB)
Appendix 5 PrairieCreek Source Term Predictions Report_Mar05.pdf (1.23 MB)
Appendix 3 PrairieCreek HC Report_Jan 2710_final.pdf (5.07 MB)
Appendix 26 Public Engagement_final.pdf (1.81 MB)
Appendix 28 CZNFuelSpillContPlan2010_final.pdf (649.73 KB)
Appendix 29 Health_and_Safety_Plan_Feb2010_final.pdf (387.13 KB)
Appendix 21 PC_FINAL_ARCH_Report.pdf (2.05 MB)
Appendix 22 WRP Cover System AlternativesFeb24.pdf (164.62 KB)
Appendix 2 CZN Treatability Report 0896-0210R01-1_final.pdf (1.28 MB)
Appendix 20 09-1112-6100 Canadian Zinc - Prairie Creek Air Q.pdf (14.32 MB)
Appendix 1B Transient Modeling Results, Prairie Creek mine.pdf (132.01 KB)
Appendix 1C Load Balance Calculations for Mine Water and Sur.pdf (275.11 KB)
Appendix 1A Site_Hydrogeology_Prairie_Creek_Mine_NWT_final.pdf (19.07 MB)
Appendix 19 Prairie Creek SEIA_(final.pdf (1.53 MB)
Appendix 18D BermRepairFinalMarch12_10.pdf (1.87 MB)
Appendix 18C Letter to INAC and DFO re Repairs to Dikes Sep .pdf (713.7 KB)
Appendix 15B CdnZinc Final Lab Report PrairieCreek S.pdf (231.73 KB)
Appendix 15C Rev 1 Canadian Zinc Final Lab Report S.pdf (2.55 MB)
Appendix 14 Mine Road DillonConsult_final.pdf (4.27 MB)
Appendix 15A Cdn Zinc Report_Golder Dec 09_final.pdf (731.59 KB)
Appendix 13_Rare Plant Study_final.pdf (2.36 MB)
Appendix 11 Preliminary Design Report-Waste Rock Pile_Feb10_.pdf (3.53 MB)
Appendix 12 _Preliminary Design Report - Water Pond_final.pdf (8.35 MB)
08-1365-0081 Fish Compensation Options Memo 30 Sept 09.pdf (2.83 MB)
Appendix 10 Receiving Water Quality During Operations_final.pdf (45.47 KB)
DAR Main Report.pdf (17.66 MB)
DFN Technical Report Statement.pdf (17.74 KB)
DFO Technical Report.pdf (1.3 MB)
DFO_Cover letter.pdf (100.35 KB)
EC EA0809-002 Technical Report.pdf (147.03 KB)
EC Technical Report Cover Letter.pdf (83.21 KB)
GNWT CanZinc SE Technical Report - FINALJune 6 2011.pdf (236.17 KB)
GNWT CZN Biophysical Technical Report June 2011.pdf (168.28 KB)
GNWT Prairie Creek Mine Technical Reports.pdf (49.39 KB)
2010-09 Responses to Information Requests.pdf (47.61 MB)
Appendix D Fig II-2 Polje Valley Terrain Interpretation.pdf (750.13 KB)
Appendix D Fig II-4 Surficial Geological Conditions.pdf (4.14 MB)
MV2008L2-0002 - Consolidated Project Description available online - Feb16-12.pdf (343.5 KB)
MV2008L2-0002 - Receipt of Consolidated Project Description - Feb16-12.pdf (343.49 KB)
MV2008L2-0002 - Consolidated Project Description FINAL - Feb15-12.pdf (10.31 MB)
MV2008L2-0002 - Extension for Project description submission date - Feb10-12.pdf (346.39 KB)
MV2008L2-0002 - Comment on operation and development of CZ Mine- MLA Nahendeh - Jan27-12.pdf (79.63 KB)
MV2008L2-0002- Request for Consolidated Project Description- Jan23-12.pdf (284.58 KB)
MV2008L2-0002- Commencement of Regulatory Process- Jan19-12.pdf (355.61 KB)
MV2008L2-0002 - Correction Letter - Nov26-09.pdf (124.71 KB)
MV2008L2-0002 - CZN Letter on EA 0809-002 - Sept11-09.pdf (5.82 MB)
MV2008L2-0002 - General Inquiry Response - June23-09.pdf (106.87 KB)
MV2008L2-0002 - Staff Report to MVEIRB - Oct06-08.pdf (1.37 MB)
MV08L2-02 Staff Report New LUP Application Oct03-08.pdf (12.67 MB)
MV08L2-02 Response to MVLWB July 14-08 Letter by CZN July18-08.pdf (129.92 KB)
MV08L2-02 Date Correction to Complete App Letter July15-08.pdf (159.5 KB)
MV08L2-02 Prairie Creek DWG Jun19-08.pdf (30.77 KB)
MV2008L2-0002 - MV2008D0014 - Geochemistry Report_April 2008 - Jun02-08.pdf (16.9 MB)
Preliminary Screening
Document Received/Sent Uploaded
MV08L2-02 Preliminary Screening of Applications Aug29-08.pdf (284.68 KB)
Public Hearing
Document Received/Sent Uploaded
MV2008D0014 MV2008T0012 MV2008L2-0002 - CZN - Closing Statement for new application - CZN - Feb22-13.pdf (500.59 KB)
MV2008D0014 MV2008T0012 MV2008L2-0002 - CZN - Closing statement submission - Feb22-13.pdf (1.74 MB)
MV2008D0014 MV2008T0012 MV2008L2-0002 - CZN - Joint closing statements - EC and DFO - Feb18-13.pdf (422.87 KB)
MV2008D0014 MV2008T0012 MV2008L2-0002 - CZN - Closing Statement for new application - AANDC - Feb15-13.pdf (195.45 KB)