Skip to main content

GNWT-INF (Sahtu) - S19S-001

​Great Bear River Bridge Construction Geotechnical and Granular Materials Investigation. The Project scope is to investigate up to ten (10) prospect material sources for their potential to supply bedrock, aggregates, granular and common fill and to conduct drilling to determine geotechnical conditions in the area of proposed bridge abutments and roadway approaches during the winter and summer of 2019. A total of 88 boreholes and 126 test pits are proposed.

Associated Water Licence: S19L8-002

Uploaded On or After
Uploaded On or Before
Displaying 1 - 48 of 48
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - Decision Letter - Jul 9_19.pdf (649.72 KB)
S19S-001 - S19L8-002 - Reasons for Decision - Jul 9_19.pdf (711.49 KB)
S19S-001 - SLWB Letter to GNWT-INF - Approval to Use Material Prospect Sites CA3 and CA4 - June 10_ 19.pdf (444.96 KB)
S19S-001 - Revised Managment Plans - Approved - Mar 13_19.pdf (176.76 KB)
S19S-001 - Decision Letter - Mar 8_19.pdf (296.81 KB)
S19S-001 - Reasons for Decision - Mar 8_19.pdf (293.03 KB)
S19S-001 - GRRB Land Use Permit - Mar 8_19.pdf (374.78 KB)
External Authorizations
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - Transport Canada Authorization - Aug 28_19.pdf (93.62 KB)
Preliminary Screening
Document Received/Sent Uploaded
S19S-001 - SLWB Preliminary Screening - Great Bear Bridge Geotechnical - Mar 8_19.pdf (306.2 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S19S-001 - Land Use Permit Application - Great Bear River Bridge - Jan 21_19.pdf (850.83 KB)
S19S-001 - Project Description - Great Bear River Bridge - Jan 21_19.pdf (16.11 MB)
S19S-001 - Information Documents and Maps - Great Bear River Bridge - Jan 21_19.pdf (28.22 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S19S-001 - GBRB Review Comment Table and attached letters - Mar 8_19.pdf (1.13 MB)
S19S-001 - GNWT-INF Great Bear Bridge Geotechnical Investigation LUP Application Staff Report 1 - Mar 8_19.pdf (444.8 KB)
S19S-001 - Hamlet of Tulita - Sewage Waste Disposal approval - Feb 26_19.pdf (30.52 KB)
S19S-001 - Correspondence regarding TK study - Great Bear River Bridge - Feb 11_19.pdf (174.49 KB)
S19S-001 - Draft Land Use Permit Conditions - GNWT-INF - Feb 8_19.pdf (829.43 KB)
S19S-001 - Letters from PWNHC - Great Bear River Bridge - Feb 5_19.pdf (579.71 KB)
3. Amendment Application
Application and Related Docs
Document Received/Sent Uploaded
S19L8-002 - S19S-001 - DFO Self-Assessment - May 31_ 19.pdf (839.33 KB)
S19S-001 - S19L8-002 - Traditional Knowledge Study - Great Bear River Bridge - May 31_ 19.pdf (448.9 KB)
S19S-001 - S19L8-002 - Amendment Request - GBRB Cover Letter - May 15_ 19.pdf (125.22 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - Staff Report 2 - Jun 25_ 19.pdf (412.61 KB)
S19S-001 - S19L8-002 - Review Comment Table and attached letters - Jun 25_ 19.pdf (530.39 KB)
S19L8-002 - S19S-001 - Correspondence - Disposal of Sand and Drill Cuttings at Tulita Landfill - June 5_ 19.pdf (113.44 KB)
Preliminary Screening
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - Notification of Preliminary Screening Determination - Jun 28_19.pdf (1.38 MB)
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - GBRB Borehole Plan - Feb 28 _ 20.pdf (2.25 MB)
S19S-001 - Tulita As-Built Borehole Locations - Nov 1_ 19.pdf (182.58 KB)
Inspection Reports
Document Received/Sent Uploaded
S19S-001 - Inspection Report - Jul 23_20.pdf (5.92 MB)
S19S-001 - Inspection Report Oct 1 2019 - Oct 8_19.pdf (5.44 MB)
Operations and Notifications
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - Drilling Work Completed - Mar 10_ 20.pdf (5.24 MB)
S19L8-002 - S19S-001 - Notification for Commencement of Work - GBRB Drilling - Feb 6_20.pdf (111.05 KB)
S19S-001- S19L8-002 - Notification - 10 Days Prior to Commencement of Work - Jan 17_20.pdf (103.03 KB)
S19S-001- S19L8-002 - Notification - 48 Hours Prior to Commencement of Work - Jan 27_20.pdf (118.26 KB)
S19S-001 - Correspondence - Granular Sites Summer Investigation Completed - Nov 1_ 19.pdf (481.36 KB)
Other
Document Received/Sent Uploaded
S19S-001 - Correspondence - Inquiry on Possibility of an Amendment Application - Nov 14_19.pdf (2.47 MB)
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
S19L8-002 - S19S-001 - Engagement Plan and Record Addendum - Oct 28_19.pdf (523.11 KB)
S19L8-002 - S19S-001 -Engagement Plan and Record - Addendum - May 15_ 19.pdf (636.39 KB)
S19S-001 - Engagement Record and Plan - Great Bear River Bridge - Jan 18_19.pdf (1.76 MB)
Sediment and Erosion Control
Document Received/Sent Uploaded
S19S-001 - Sediment and Erosion Control Plan v. 2.0 - Mar 12_19.pdf (677.86 KB)
S19S-001 - Sediment and Erosion Control Plan - Great Bear River Bridge - Version 1 - Jan 29_19.pdf (675.93 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S19L8-002 - S19S-001 - Spill Contingency Plan Addendum Ver 2.0 - Oct 28_19.pdf (1.16 MB)
S19L8-002 - S19S-001 - Spill Contingency Plan Addendum - May 15_ 19.pdf (1.85 MB)
S19S-001 - Spill Contingency Plan v. 2.0 - Mar 12_19.pdf (1.05 MB)
S19S-001 - Spill Contingency Plan - Great Bear River Bridge - Jan 18_19.pdf (1.08 MB)
Waste Management Plan
Document Received/Sent Uploaded
S19L8-002 - S19S-001 - Waste Management Plan Addendum Ver 2.0 - Oct 28_19.pdf (461.86 KB)
S19L8-002 - S19S-001 - Waste Management Plan Addendum - May 15_ 19.pdf (1.1 MB)
S19S-001 - Waste Management Plan v.2.0 - Mar 13_19.pdf (702 KB)
S19S-001 - Waste Management Plan - Great Bear River Bridge - Jan 18_19.pdf (697.78 KB)