Skip to main content

Enbridge Pipelines (NW) Inc. - MV2017P0013

Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.

Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.

Associated Water Licence: MV2017L1-0002.
Uploaded On or After
Uploaded On or Before
Displaying 101 - 198 of 198
2. Initial/Renewal Application
Public Hearing
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 Enbridge Pipelines - hearing reference 1 - Mackenzie River Inconnu 1998.pdf (354.9 KB)
MV2017P0013 MV2017L1-0002 Enbridge Pipelines - hearing reference 2 - Boreal caribou study 2017.pdf (1.93 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Corrections to Volue 1 and 2 of transcripts from Oct 27-28 2017 - Nov7-17.pdf (93.39 KB)
MV2017P0013 MV2017L1-0002 - Enbridge -Omission in transcripts - Public Hearing, Oct 27-28, 2017 - Oct31-17.pdf (94.7 KB)
MV2017P0013 MV20171-0002 - Enbridge - Line 21 - additional questions from DFN to Enbridge - Oct31-17.pdf (82.36 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Letter to AOs Aboriginal Consultation Obligations - Oct19-17.pdf (317.37 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing Transcript - Day 1 of 2 - Oct27-17.pdf (1.7 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing Transcript - Day 2 of 2 - Oct28-17.pdf (831.68 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Request for clarification regarding MVLWB Agenda - LKFN - Oct27-17.pdf (54.01 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Hearing Agenda - V.2 - Oct 26_17.pdf (445.45 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Liidlii Kue First Nation Presentation - Redacted Version - Oct 20_17.pdf (2.58 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Liidlii Kue First Nation Presentation Attachments - Redacted Version - Oct 20_17.pdf (11.88 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Presentation - Oct 20_17.pdf (625.87 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion - Staff Report - Oct19-17.pdf (1.05 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Request for confidentiality Board Decision Letter - Oct19-17.pdf (266.38 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Sambaa K'e First Nation Presentation - Oct 18_17.pdf (424.92 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Sambaa K'e First Nation Presentation Attachments - Oct 18_17.pdf (6.07 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion - GNWT Comment - Oct 19_17.pdf (339.35 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion - Enbridge Response - Oct 19_17.pdf (95.16 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Dehcho First Nations Presentation - Oct 17_17.pdf (649.26 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion - SKFN Letter of Support - Oct 18_17.pdf (331.97 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Hearing Agenda - Oct 17_17.pdf (437.48 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion for Confidentiality - Oct 17_17.pdf (1.47 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - GNWT Presentation - Oct 16_17.pdf (261.56 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Response to Interventions - Oct 13_17.pdf (1.02 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Response to Interventions - Draft Environmental Protection Plan - Oct 13_17.pdf (9.44 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Response to Interventions - Mack. River Sediment Model Report - Oct 13_17.pdf (3.64 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Response to Interventions - Revised AOA - Oct 13_17.pdf (7.12 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Response to Interventions - Turbidity Monitoring Plan - Oct 13_17.pdf (1.22 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion - Letter to Enbridge - Oct12-17.pdf (571.82 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion - Letter to LKFN - Oct12-17.pdf (572.46 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion - Staff Report - Oct12-17.pdf (274.24 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Hearing Agenda - Oct 12_17.pdf (434.76 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - CANNOR Comments on LKFN Motion - Oct 11_17.pdf (29.77 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Response to LKFN Motion - Oct 11_17.pdf (21.04 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - GNWT Comments on LKFN Motion - Oct 10_17.pdf (415.03 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - MVLWB Request for Comment on LKFN Motion to Filing Supplementary Info - Oct 5_17.pdf (9.14 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - MVLWB Response to LKFN Intervention - Oct 4_17.pdf (126.34 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Motion to the MVLWB to Submit Info After Deadline - Oct 5_17.pdf (9.11 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - SKFN Intervention - Oct 3_17.pdf (1.59 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - DFN Intervention - Oct 2_17.pdf (333.56 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Intervention - Oct 3_17.pdf (1.42 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - LKFN Comment on Draft Conditions - Sept 29_17.pdf (507.2 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - GNWT Intervention - Sept 29_17.pdf (1.27 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - GNWT Comment on Draft Conditions - Sept 29_17.pdf (574.19 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - SKFN Request For Extension - Sep 28_17.pdf (403.31 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - SKFN Request For Extension - Sep 25_17.pdf (402.54 KB)
MV2017P0013 and MV2017L1-0002 - Enbridge - Reminder of Pre-Hearing on September 15 2017 for New Applications - Sept7-17.pdf (562.47 KB)
Technical Session
Document Received/Sent Uploaded
MV2017P0013 and MV2017L1-0002 - Enbridge Pipelines - Pre-hearing Conference Agenda - Aug25-17.pdf (550.03 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines - Inspection Report for June 17 2019 - GNWT Lands - Jul31-19.pdf (1.38 MB)
MV2017P0013 - Enbridge Pipelines NW Inc - Inspection Report for February 4 2019 - GNWT Lands - Feb21-19.pdf (1.1 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for September 20 2018 - GNWT Lands - Oct5-18.pdf (1.34 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for October 19 2018 - GNWT Lands - Oct20-18.pdf (2.13 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for October 2 2018 - GNWT Lands - Oct20-18.pdf (1.47 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for September 21 2018 - GNWT Lands - Oct19-18.pdf (1.38 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for September 24 2018 - GNWT Lands - Oct18-18.pdf (1.83 MB)
MV2017P0013 - Enbridge Pipelines NW Inc - North Site - Inspection Report for September 12 2018 - GNWT Lands - Sept14-18.pdf (2.15 MB)
MV2017P0013 - Enbridge Pipelines - July 4 Inspection Report - July 17_18.pdf (1.31 MB)
MV2017P0013 - Enbridge Pipelines - July 12 Inspection Report - July 18_18.pdf (2.05 MB)
MV2017P0013 - Enbridge Pipelines - June 5 Inspection Report - July 9_18.pdf (940.53 KB)
MV2017P0013 - Enbridge Pipelines - June 14 Inspection Report - July 17_18.pdf (1.11 MB)
MV2017P0013 - Enbridge Pipelines - June 25 Inspection Report - July 17_18.pdf (2.37 MB)
MV2017P0013 - Enbridge Pipelines - June 28 Inspection Report - July 17_18.pdf (2.07 MB)
MV2017P0013 - Enbridge Pipelines (NW) Inc - Inspection Report (Aug 10) - Sept 3, 2018.pdf (1.3 MB)
MV2017P0013 - Enbridge Pipelines (NW) Inc - Inspection Report (Aug 13) - Sept 3, 2018.pdf (1.93 MB)
MV2017P0013 - Enbridge Pipelines NW Inc - Inspection Report for May 29-30 2018 - GNWT Lands - Jun1-18.pdf (2.81 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for April 24 2018 - GNWT Lands - May2-18.pdf (2.11 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for April 4 2018 - GNWT Lands - Apr11-18.pdf (1.3 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for April 10 2018 - GNWT Lands - Apr11-18.pdf (2.19 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for March 28 2018 - GNWT Lands - Apr11-18.pdf (820.35 KB)
MV2013P0011 MV2017P0013- Enbridge Pipelines - Response to March 2018 inspection reports - Mar27-18.pdf (63 KB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for March 21 2018 - GNWT Lands - Mar22-18.pdf (807.48 KB)
Operations and Notifications
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines – 10 Day Prior to Completion of Operation Notification - Oct 4_18.pdf (129.2 KB)
MV2017P0013 - Enbridge Pipelines - List of Mud Components Used - Aug 22_18.pdf (22.89 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Spring 2018 Newsletter - Mar 15_18.pdf (3.74 MB)
MV2017P0013 - Enbridge Pipelines NW Inc. - 48 Hour Notification to Start of Operations - March 14_18.pdf (136.35 KB)
Public Hearing
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge - Line 21 - Notice of additional time to respond - Nov16-17.pdf (110.19 KB)
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines - Engagement Plan - Approval Letter - Mar15-18.pdf (160.32 KB)
MV2017P0013 - Enbridge Pipelines - Engagement Plan - Staff Report and Comments - Mar15-18.pdf (345.93 KB)
MV2017P0013 - Enbridge Pipelines - Request for comments on Revised Engagement Plan - Feb23-18.pdf (391.85 KB)
MV2017P0013 - Enbridge Pipelines - Engagement Plan V1.2 - Feb 22_18.pdf (224.27 KB)
MV2017P0013 - Enbridge Pipelines - Engagement Plan V1.2 - EMC Support Letter - Feb 23_18.pdf (542.59 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan V.1 - Mar 23_17.pdf (10.75 MB)
Waste Management Plan
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Drilling Mud Flocculent - July 19_18.pdf (570.29 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Tackifier on Shoo-Fly - July 3_18.pdf (3.51 MB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Sump Additive - July 10_18.pdf (289.45 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Drill Cutting Solidification - June 19_18.pdf (280.99 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Waste Management Plan V1- Staff Report and Comments - May10-18.pdf (775.58 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Waste Management Plan V1-3 - Approval Letter - May10-18.pdf (291.74 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Waste Management Plan V 1.3 - April 12_18.pdf (15.37 MB)
MV2017P0013 MV2017L1-0002 - Enbridge Pieplines - Request for comments on WMP - V1-3 - Apr13-18.pdf (384.89 KB)
MV2017P0013 - Enbridge Pipelines - Waste Management Plan - Decision Approval Letter - Mar15-18.pdf (364.42 KB)
MV2017P0013 - Enbridge Pipelines - Waste Management Plan - Staff Report and Comments - Mar15-18.pdf (20.8 MB)
MV2017P0013 - Enbridge Pipelines - Request for comments on the Revised Waste Management Plan - Feb23-18.pdf (395.13 KB)
MV2017P0013 - Enbridge Pipelines - Waste Management Plan V1.2 - Feb 22_18.pdf (2.08 MB)
MV2017P0013 - Enbridge Pipelines - Waste Management Plan V1.2 - EMC Support Letter - Feb 22_18.pdf (541.18 KB)
9. GIS Data
GIS Data
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Updated GIS Data - Apr 25_17.zip (14.29 KB)
Shapefiles
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Zip File - GIS Data - Apr25-17.zip (14.29 KB)