Enbridge Pipelines (NW) Inc. is proposing to replace a segment of its Line 21 pipeline (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.

Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.

Associated Water Licence: MV2017L1-0002

Documents

Displaying 1 - 100 of 191
E.g., 02/17/2019
E.g., 02/17/2019

1. Permit - Licence - Other Issuances

All Issuances
Document Received/Sent Uploaded
MV2017P0013 - Enbridge - Issuance Letter with Permit and Conditions - RFD - Feb2-18.pdf (1.25 MB) February 2, 2018 February 20, 2018
MV2017P0013 - Enbridge - Reason for Decision - Issuance - Feb16-18.pdf (4.66 MB) February 16, 2018 February 20, 2018
External Authorizations
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines - Inspectors Authorization for Extension to Spring Breakup Date - March 27_18.pdf (46.29 KB) March 27, 2018 March 27, 2018
MV2017P0013 - Enbridge Pipelines - Inspectors Authorization for Manners Creek - March 15_18.pdf (42.22 KB) March 15, 2018 March 16, 2018
MV2017P0013 - Enbridge Pipelines NW Inc. – Enbridge Response to ADKFN Comments – Feb 15_18.pdf (99.64 KB) February 15, 2018 February 15, 2018
MV2017P0013 - Enbridge Pipelines NW Inc. – ADKFN Comments on Amendment to Easement – Feb 1_18.pdf (177.32 KB) February 1, 2018 February 9, 2018
MV2017P0013 - Enbridge Pipelines - GNWT Lands Request for comments on Amendment to Easement - Jan2-18.pdf (4.76 MB) January 2, 2018 February 9, 2018
Further Study Requested Sec. 22.2.b
Document Received/Sent Uploaded
MV2017P0013 - Enbridge - Review Comment Table from Applications - May 25_17.pdf (808.14 KB) May 25, 2017 May 25, 2017
Security and Water Use Fees
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines - Acknowledgement Letter for Receipt of Security Deposit - GNWT Lands - Mar15-18.pdf (147.7 KB) March 15, 2018 March 16, 2018

2. Initial/Renewal Application

Application and Related Docs
Document Received/Sent Uploaded
MV2017L1-0002 MV2017P0013 - Enbridge - Staff Report on Applications - Jan 30_18.pdf (527.35 KB) January 30, 2018 February 14, 2018
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.3.pdf (383.88 KB) September 28, 2017 September 28, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Update LUP and WL Application - Sept22-17.pdf (5.99 MB) September 22, 2017 September 22, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Pre-Hearing Conference Meeting Notes - Sept 15_17.pdf (322.16 KB) September 15, 2017 September 22, 2017
MV2017P0013 MV2017L10002 - Enbridge Pipelines - News North Newspaper Ad - Aug 28_17.pdf (1 MB) August 28, 2017 September 21, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.2.pdf (383.79 KB) September 18, 2017 September 18, 2017
MV2017P0013 - Enbridge - DRAFT Permit Conditions V.2.pdf (490.79 KB) August 25, 2017 August 25, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.1.pdf (383.84 KB) August 17, 2017 August 17, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Review Comments on Draft Work Plan - Aug 16_17.pdf (826.17 KB) August 16, 2017 August 16, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - DRAFT External Work Plan V.1.pdf (393.08 KB) August 10, 2017 August 10, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Receipt for LUP and WL Application fee - C0153028 - Apr13-17.pdf (229.77 KB) April 13, 2017 June 20, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc - Response to Information Request 1 - Jun7-17.pdf (136.41 KB) June 7, 2017 June 7, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc - Information Request 1 - Section 157-1 MVRMA - May31-17.pdf (289.47 KB) May 31, 2017 June 1, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Participation of Board Chair in Board Decision-Making - May 15_17.pdf (429.03 KB) May 15, 2017 May 15, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Supplemental Informatoin - Biophysical Assessment Report - Apr 4_17.pdf (14.42 MB) May 4, 2017 May 5, 2017
MV2017L1-0002 MV2017P0013 - Enbridge Pipelines - Application - Request for Comment - Apr19-20.pd.pdf (106.97 KB) April 19, 2017 April 27, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Supplemental Informatoin - Revised Appendix II and VII - Apr 25_17.pdf (18.64 MB) April 25, 2017 April 25, 2017
MV2017P0013 - Enbridge Pipelines - DRAFT Estimated Security Template - Apr 21_17.pdf (571.42 KB) April 21, 2017 April 24, 2017
MV2017P0013 - Enbridge Pipelines - DRAFT Permit Conditions - Apr 21_17.pdf (796.54 KB) April 21, 2017 April 21, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Complete Application.pdf (329.54 KB) April 19, 2017 April 19, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Incomplete Application - Mar 31_17.pdf (324.01 KB) March 31, 2017 April 3, 2017
MV2017P0013 - Enbridge Pipelines - New LUP Application - Mar23-17.pdf (39.45 MB) March 24, 2017 March 23, 2017
Conceptual Closure and Reclamation Plan
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan Version 1 - Approved - Aug17-17.pdf (778.38 KB) August 17, 2017 August 18, 2017
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc. - Enbridge Final Arguments - Jan 17_18.pdf (642.5 KB) January 17, 2018 January 17, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc. - DFN Final Arguments - Jan 12_18.pdf (581.3 KB) January 12, 2018 January 15, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc. - GNWT Final Arguments - Jan 12_18.pdf (499.56 KB) January 12, 2018 January 15, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc. - GNWT Final RECLAIM - Jan 12_18.pdf (21.41 KB) January 12, 2018 January 15, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc. - LKFN Final Arguments - Jan 12_18.pdf (237.2 KB) January 12, 2018 January 12, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc. - SKFN Final Arguments - Jan 12_18.pdf (545.93 KB) January 12, 2018 January 12, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipeline Inc. - Town of Hay River Letter of Support - Jan 8_18.pdf (248.79 KB) January 8, 2018 January 8, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Response to Information Request 3 - Jan 3_18.pdf (4.11 MB) January 3, 2018 January 3, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc - Information Request 3 - Extension granted - Dec22-17.pdf (102.41 KB) December 22, 2017 December 22, 2017
MV2017L1-0002 MV2017P0013 - Enbridge - IR3 to Enbridge - Dec 19_17.pdf (166.39 KB) December 19, 2017 December 20, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.5.pdf (200.98 KB) December 12, 2017 December 12, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.6.pdf (201.15 KB) December 12, 2017 December 12, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - NEB Letter to all Parties - Nov 20_17.pdf (86.91 KB) November 20, 2017 December 6, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.4.pdf (383.9 KB) October 12, 2017 October 12, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - New LUP and WL Applications - Interventions and Updated Work Plan V3 - Sept28-17.pdf (780.44 KB) September 28, 2017 October 2, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - New LUP and WL Application - Notice of Additional Information - Sept22-17.pdf (80.99 KB) September 22, 2017 September 25, 2017
MV2017P0013 MV2017L1-0002 - GNWT Response to July 28_17 Letter from LKFN and SKFN - Sept 22_17.pdf (425.69 KB) September 22, 2017 September 22, 2017
MV2017P0013 and MV2017L1-0002 - Enbridge - Updated deadline for review of Draft Condtiions - Sept18-17.pdf (780.68 KB) September 18, 2017 September 20, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc - Workplan and Ongoing Regulatory Review - Sept1-17.pdf (1.14 MB) September 1, 2017 September 11, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc - Workplan and Ongoing Regulatory Review - Staff Report - Sept1-17.pdf (310.25 KB) September 1, 2017 September 11, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pieplines - Request for comments on New Applications - Aug28-17.pdf (109.48 KB) August 28, 2017 August 31, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Letter from Imperial to Minister Carr - Norman Wells Hearing Delay - Aug 2_17.pdf (139.19 KB) August 2, 2017 August 3, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Letter from LKFN - Need for a Meeting to Clarify Harmonized Process - Aug 1_17.pdf (112.19 KB) August 1, 2017 August 2, 2017
MV2017P00013 - Enbridge - NEB postponement of regulatory process.pdf (105.58 KB) July 26, 2017 July 26, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Board direction - proposed Line 21 Segment Replacement Project - Jul20-17.pdf (284.39 KB) July 20, 2017 July 20, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Review Comments on initial applications - May25-17.pdf (2.29 MB) May 25, 2017 July 6, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Enbridge Response to LKFN and SKFN - Jun21-17.pdf (46.17 KB) June 21, 2017 June 22, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Request for comments on New LUP And WL Application - Jun7-17.pdf (359.52 KB) June 7, 2017 June 9, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Project Update - Jun7-17.pdf (275.94 KB) June 7, 2017 June 8, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Letter from NEB to MVLWB - May 18_17.pdf (100.25 KB) May 18, 2017 May 19, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Participation of Board Chair in Board Decision-Making - GNWT Letter - May 18_17.pdf (292.63 KB) May 18, 2017 May 18, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Reminder for comment submission deadline - May15-17.pdf (81.38 KB) May 15, 2017 May 17, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Notification of Participation of Board Chair in Board Decision-Making - May15-17.pdf (860.91 KB) May 15, 2017 May 16, 2017
Further Study Requested Sec. 22.2.b
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines NW Inc - Further Study Required - Staff Report - May25-17.pdf (438.14 KB) May 25, 2017 June 2, 2017
MV2017P0013 - Enbridge Pipelines NW Inc - Further Study Required - May31-17.pdf (703.41 KB) May 31, 2017 June 1, 2017
Preliminary Screening
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge - Norman Wells Pipeline - 1981 Report of EA Panel.pdf (4.54 MB) September 8, 2017 September 14, 2017
MV2017P0013 MV2017L-0002 - Enbridge Pipelines Inc. - s.157.1 Determination - Staff Report and Comments - Aug3-17.pdf (1.77 MB) August 3, 2017 August 21, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - 157.1 Reasons for Decision - Aug 10_17.pdf (375.2 KB) August 10, 2017 August 11, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Review Comment Table with Attached Comments - Aug 3_17.pdf (2.43 MB) August 3, 2017 August 8, 2017
MV2017P0013 MV2017L-0002 - Enbridge Pipelines (NW) Inc. - s.157.1 Determination.pdf (284.33 KB) August 4, 2017 August 4, 2017
Public Hearing
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Public Hearing - Commitments Table V3 - Jan 23_18.pdf (223.99 KB) January 23, 2018 January 23, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Transcripts of January 8-9 2018 Public Hearing - Jan16-18.pdf (59.62 KB) January 16, 2018 January 19, 2018
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing Reconvened - Transcript Day 1 of 2 - Jan08_18.pdf (1.55 MB) January 16, 2018 January 16, 2018
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing Reconvened - Transcript Day 2 of 2 - Jan09_18.pdf (1.03 MB) January 16, 2018 January 16, 2018
MV2017P0013 MV2017L1-0002 - Enbridge - May 5_17 GNWT RECMAIM Model - Jan 8_18.xlsx (492.96 KB) January 8, 2018 January 12, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipeline Inc. - LKFN and Enbridge Joint Statement to MVLWB - Jan 8_18.pdf (658.67 KB) January 8, 2018 January 8, 2018
MV2017P0013 MV2017L1-0002 - Enbridge - Sambaa K'e First Nation Presentation - Version 2 - Jan 8_18.pdf (529.77 KB) January 8, 2018 January 8, 2018
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Response to LKFN Request on 1981 Report of EA Panel - Jan 4_18.pdf (696.84 KB) January 4, 2018 January 5, 2018
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc - Information Request 3 - Dec19-17.pdf (350.93 KB) December 19, 2017 December 20, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Comments on Addition to workplan - GNWT Lands - Dec15-17.pdf (325.63 KB) December 15, 2017 December 18, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc. Line 21 Replacement - Work Plan updated - Dec12-17.pdf (57.5 KB) December 12, 2017 December 12, 2017
MV2017P0013 MV2017L1-0002 - Enbridge Public Hearing Part 1 - Commitments Table - Dec11_17_V2.pdf (96.52 KB) December 11, 2017 December 11, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Dehcho First Nations Updated Presentation - Dec 4_17.pdf (1.99 MB) December 4, 2017 December 5, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - GNWT Presentation - No Changes - Dec 4_17.pdf (211.2 KB) December 4, 2017 December 5, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Reconvened Public Hearing - Pre-Hearing Conference notes Dec 01_17.pdf (197.31 KB) December 1, 2017 December 1, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing Transcript - Day 1 of 2 - Oct27_17 V2.pdf (2.35 MB) November 24, 2017 November 27, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing Transcript - Day 2 of 2 - Oct27_17 V2.pdf (1.42 MB) November 24, 2017 November 27, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Enbridge Responses to DFN Additional Questions - Nov22-17.pdf (4.98 MB) November 22, 2017 November 22, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing - Notice of Directive to Parties - Nov20-17.pdf (653.83 KB) November 20, 2017 November 20, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing - Pre-Hearing Conference November 22 2017 - Nov16-17.pdf (833.92 KB) November 16, 2017 November 17, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Note to File – references cited in Public Hearing on Oct 28 2017 - Nov10-17.pdf (109.12 KB) November 10, 2017 November 15, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Questions from DFN re Line 21 Sengment project - Nov10-17.pdf (136.15 KB) November 10, 2017 November 15, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Update on Public Hearing for Line 21 Segment - Nov 10_17.pdf (203.89 KB) November 10, 2017 November 15, 2017
MV2017P0013 MV2017L1-0002 Enbridge Pipelines - hearing reference 1 - Mackenzie River Inconnu 1998.pdf (354.9 KB) October 27, 2017 November 10, 2017
MV2017P0013 MV2017L1-0002 Enbridge Pipelines - hearing reference 2 - Boreal caribou study 2017.pdf (1.93 MB) October 27, 2017 November 10, 2017
MV2017P0013 MV2017L1-0002 - Enbridge - Corrections to Volue 1 and 2 of transcripts from Oct 27-28 2017 - Nov7-17.pdf (93.39 KB) November 7, 2017 November 8, 2017
MV2017P0013 MV2017L1-0002 - Enbridge -Omission in transcripts - Public Hearing, Oct 27-28, 2017 - Oct31-17.pdf (94.7 KB) October 31, 2017 November 1, 2017
MV2017P0013 MV20171-0002 - Enbridge - Line 21 - additional questions from DFN to Enbridge - Oct31-17.pdf (82.36 KB) October 31, 2017 November 1, 2017